Villages of CC P5-CS 960927The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
September 27, 1996
Pat Atkins
Tipton Engineering,Inc.
6330 Belt Line Rd., Suite C
Garland, TX 75043
Village at Cottonwood Creek, Section V
Development Fee Assessment
Dear Mr Atkins:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $181,610.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
SienC~er~Y~ .~rlf~, p. ~.
Assistant City Manager/City Engineer
CCi
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
u uL_ ............
PUBLIC WORKS
DEVELOPMENT FEE TABLv
Project: Village at Cottonwood Creek, Section V
Date: 9/27/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $28,800.00 $28,800.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,050.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,369.39
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $96.60
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,770.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $26,550.00 $26,550.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,950.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,950.00
(100% due at Issuance of Building Permit)
Park Fee $75,815.00 $75,815.00
(100% due prior to Council Approval)
Roadway Impact Fee $50,445.00 $50,445.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
$193,865.99
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $181,610.00
D~VELOPMENT FEE WORKSHEI-r
PROJECT: Village at Cottonwood Creek, Section V
WaterDATE: Impact 9~27~96Fee:/d~o~~
Meter(s)' r'"~'59 5/8 inch
Domestic . -
Irrigation Meter(s): 2 - 1 inch
X 3/4 inch = 59
Fireline Meter(s): 0 N/A
= 5
Total #: 64 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap lnnpection Fee:
Total #: 61 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 59 Domestic Meter(s) @ $23.21
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 2 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$48.30
Water Meter Deposit Fee (Domestic):
Total #: 59 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
59
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 59 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ali developments):
Total #: 59 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$28,800.00
$3,050.00
$1,369.39
$96.60
$0.00
$0.00
$1,770.00
$70.00
$26,550.00
$2,950.00
$2,950.00
Page 1
D,-VELOPMENT FEE WORKSHE,-r
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
MuFti-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
59
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T,U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292,60 per light will be assessed.
{100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$75,815.00
N/A
$50,445.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Informa~on not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULAi~IONS
PROJECT:
DATE:
Wtilage at Cottonwood Creek, Section V
9/27/96
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
Building Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) --
Single-Family Detached
N/A
59
2.85
$300
s o,44s.oo
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2. Page 3 - Roadway Impact Fee Study)
~PHONE CALLi
[] FAX RETURNED
PHONE0 MOS'LE ~ I IYOUR CALL
.SIGNED ~ ~ ~ ~~E ~ ~C4-400.