Loading...
Villages of CC P5-CS 960927The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 September 27, 1996 Pat Atkins Tipton Engineering,Inc. 6330 Belt Line Rd., Suite C Garland, TX 75043 Village at Cottonwood Creek, Section V Development Fee Assessment Dear Mr Atkins: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $181,610.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. SienC~er~Y~ .~rlf~, p. ~. Assistant City Manager/City Engineer CCi Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services u uL_ ............ PUBLIC WORKS DEVELOPMENT FEE TABLv Project: Village at Cottonwood Creek, Section V Date: 9/27/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $28,800.00 $28,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,050.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,369.39 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $96.60 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,770.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $26,550.00 $26,550.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $2,950.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,950.00 (100% due at Issuance of Building Permit) Park Fee $75,815.00 $75,815.00 (100% due prior to Council Approval) Roadway Impact Fee $50,445.00 $50,445.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts $193,865.99 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $181,610.00 D~VELOPMENT FEE WORKSHEI-r PROJECT: Village at Cottonwood Creek, Section V WaterDATE: Impact 9~27~96Fee:/d~o~~ Meter(s)' r'"~'59 5/8 inch Domestic . - Irrigation Meter(s): 2 - 1 inch X 3/4 inch = 59 Fireline Meter(s): 0 N/A = 5 Total #: 64 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap lnnpection Fee: Total #: 61 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 59 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 2 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.30 Water Meter Deposit Fee (Domestic): Total #: 59 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 59 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 59 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total #: 59 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $28,800.00 $3,050.00 $1,369.39 $96.60 $0.00 $0.00 $1,770.00 $70.00 $26,550.00 $2,950.00 $2,950.00 Page 1 D,-VELOPMENT FEE WORKSHE,-r Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot MuFti-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 59 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292,60 per light will be assessed. {100% due prior to final acceptance of development) N/A N/A N/A N/A $75,815.00 N/A $50,445.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Informa~on not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULAi~IONS PROJECT: DATE: Wtilage at Cottonwood Creek, Section V 9/27/96 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- Single-Family Detached N/A 59 2.85 $300 s o,44s.oo * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2. Page 3 - Roadway Impact Fee Study) ~PHONE CALLi [] FAX RETURNED PHONE0 MOS'LE ~ I IYOUR CALL .SIGNED ~ ~ ~ ~~E ~ ~C4-400.