Valley R Plaza 1P-CS 881025The City With A Beautiful Future
P.O, Box 478
Coppell, Texas 75019
214- 462- 0022
October 25, 1988
Dunning Development Corp.
Iland;~l] 1<. Conzalez
/00[ Pr:eaton Rd.
B through I
After meeting with you several times on site, I feel the easiest
way to straighten this situation out will be for me to provide you
with a list of items that will have to be completed and verified
for: a city acceptance of utilities only. They are as follows:
]) Ail valves stack will be put to their finish grade and a 2'
x 2' concrete pad installed.
2) Ail meter cans to be installed and adjusted~to grade.
3) Water line "WC" will be installed with all fire hydrants, valves
;H~(I mci;er vaults.
4) Storm sewer lines "DA" and "DB" to be cleaned and installed.
5) All inlets to be installed to grade with tops and throats.
6) A conceptual plan for phasing paving, ie. fire lanes.
7) Remove 2" service line for Pad H and retap connection on line
8) All sanitary sewer clean out to be set at finish grade and
iron installed with concrete Pads.
9) Ail fire hydrants to be painted with appropriate color code.
cast
10) One (1) year maintenance bond.
].1) of.' mylars ~nd, (2) sets of
12) city walk thru and ~0m~l~tion of any
As Built Drawings - Two (2)'~ set
blue lines marker "As Builts"~
Completion of a formal
and all punch list items.
As soon as Pace Co. (Goodyear) completes their foundation, no other
work shall be done on pads B through I of the Valley Ranch Plaza,
until an agreement can be made 'for the completion of all the ~bove
mentioned deficient items
Thank~ yo~, ~
Steven~M.-~Morton ~ '
'Chief Developmental Inspector
SMM/bb
cc: S.~eve Goram, Director of Public Works
~ace Development Co.