Loading...
Valley R Plaza 1P-CS 880624June 24, 1988 Pat Donavan Dunning Dev. 7001 Preston Rd. Suite 500 Dallas, Texas 75205 City With A Beautiful Future RE: Inspection Fee for utility construction Valley Ranch Plaza Dear Mr. Donavan: Based upon date received from Albert H. Halff A~sociates is 1. 12-inch W-L along MacArthur Blvd. and Belt Line Rd. 2. 8-inch W-L along MacArthur Blvd. 3. 6-inch Sanitary Sewer along Belt Line Road 4. Construction of water crossing of Belt Line Road 5. Trench Safety System for utility lines 6. Trench Safety System for bore pits TOTAL Inspection fee of 1.5% x $61,427.41 = $921.41. upon receipt of this assessment. P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 as follows: $14,051.50 $18,407.00 $ 2,956.74 $25,460.00 $ 152.17 $ 400.00 $61,427.41 This fee is due and payable Thank you, . Steven M. Morton Chief Developmental Inspector Sl~,I/bb cc: Steve Goram, Director of Public Works