Valley R Plaza 1P-CS 880624June 24, 1988
Pat Donavan
Dunning Dev.
7001 Preston Rd.
Suite 500
Dallas, Texas 75205
City With A Beautiful Future
RE: Inspection Fee for utility construction Valley Ranch Plaza
Dear Mr. Donavan:
Based upon date received from Albert H. Halff A~sociates is
1. 12-inch W-L along MacArthur Blvd. and Belt Line Rd.
2. 8-inch W-L along MacArthur Blvd.
3. 6-inch Sanitary Sewer along Belt Line Road
4. Construction of water crossing of Belt Line Road
5. Trench Safety System for utility lines
6. Trench Safety System for bore pits
TOTAL
Inspection fee of 1.5% x $61,427.41 = $921.41.
upon receipt of this assessment.
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
as follows:
$14,051.50
$18,407.00
$ 2,956.74
$25,460.00
$ 152.17
$ 400.00
$61,427.41
This fee is due and payable
Thank you, .
Steven M. Morton
Chief Developmental Inspector
Sl~,I/bb
cc: Steve Goram, Director of Public Works