Loading...
Valley R Plaza 1P-CS 880302COPPELL PUBLIC WORKS March 2, 1988 TO: FROM: RE: Alan Ratliff, City Manager Steve Goram, Director of Public Works Valley Ranch Plaza - Final I have been informed by Steve Morton, Public Works Inspector, that the Valley Ranch Plaza plat which is going forward to the City Council for their consideration has not been addressed by the Public Works staff in the areas of Streets/Water/Parks & Inspections. The areas that have not been addressed, as best as can be determined without a set of construction plans, are as follows: Extension of 12" water main on south side of Beltline Road to the project's west property line. Extension of 12" water main ~long west side of MacArthur Blvd. Extension of 12" water main from north side of Beltline Road. The disconnection from Irving water line. Extension of sanitary sewer along Beltline Road and MacArthur Blvd.. Property owner Maintenance Agreement for common areas. Flood Plain certificate from Flood Plain Administration. Full set of construction plans. Full set of Irrigation plans w/ licensed irrigator seal. Full set of Landscaping Plans w/ licensed landscaping/ architect seal. On March 2, 1988, staff received a water and sewer layout sheet. However, without a complete set of construction plans, staff cannot determine the direction the engineer intends to develop the property. Staff had to calculate all the fees based on the sheet provided at the last minute, resulting in them having to drop all other work projects to accomplish this which postponed other items of importance. The fees that have been calculated and are applicable, in staff's opinion, to the referenced project are attached. Steve Morton has assured me that he has not let anything drop between the cracks on this project and has vigorously attempted to ascertain the information necessary for Public Works's review. Therefore, I am requesting your assistance to ensure this type of situation does not occur again, In speaking with staff and reviewing the one sheet provided the Public Works Inspector on March 3, 1988, we cannot concur with the recommendation provided you from Planning and Zoning which in my understanding reflects the Development Review Committee's recommendation re~arding thi~ plat. SCG/sm kttachment Fees: Water/ Sewer Availability Fee = SF Building Tract B = SF Building Tract C = SF Building Tract D = SF Building Tract E = SF Building Tract F = SF Building Tract G = SF Building Tract H = SF Building Tract I = 4000 SF 7000 SF 2300 SF 6500 SF 4000 SF 2800 SF 3400 SF 5871 SF $120.00 per 1000 SF of Building Total = 35,871 SF 35,871 X $120.00 Water Tap Fee Sewer Tap Fee Park Fund $100.00 per tap = (3 taps) $100.00 per tap = Street Light - Pending information TU Electric Street Sign = $4,304.52 $300.00 $100.00 N/A N/A 50% due @ final plat $2152.26 50% due @ building permit $2152.26 COPPELL PUBLIC NO~KS }{arch 1, 1988 TO: Steve Goram, Director of Public Works FROM: Steven Morton, Public Works Inspector RE: Valley Ranch Plaza - Final Kevin Pieffer received plans on February 22, 1988. As of this date, I have not received plans in order to verify Public Works recommendations have been met. Kevin will get me a set of plans today, but I will not be able to get your required report 1 week prior to your staff meeting tomorrow.