Valley R Plaza 1P-CS 870421ALBERT H. tIALFF ASSOCIATES, INC.
ENGINEERS ANI) SCIENTISTS
Aprll 21, 1987
AVO 7377
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Attn: Ha. Shohre Daneshmand
Re:
Valley Ranch Phase IV
Water and Sanitary Sewer
Dear Shohre:
Please find attached, 7 sets of revised plans for the above referenced
project. We have addressed Hr. Gabe Favre's comments, a copy of which ia
attached, as follova:
We have added the future lO-foot by 300-foot right-of-way
dedication at the southeast corner of MacArthur Boulevard and Belt
Line Road as requested by the City of Coppell.
2.) We have revised the notes on the plan and profile of line WB to
include steel encasement in accordance with City of Coppell
S rand arda. ~
d changes made durxng eonstruetxon. In our telephone
conversation on April 20, 1987 ~ith ~r. Cabe Paure of Oinn, Ine.~
~e agreed to install a 24 x 12 tee if the existing 26" ~ater hine
needs to be extended to meet the proposed 12" llne beneath Belt
hine ~. ~hi$ detemlnatlon should be made ~hen the 26" ~ater
hlne i$ uncovered in the field prior to construction.
TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL SURVEYING