Loading...
Valley R Plaza 1P-CS 870421ALBERT H. tIALFF ASSOCIATES, INC. ENGINEERS ANI) SCIENTISTS Aprll 21, 1987 AVO 7377 City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Attn: Ha. Shohre Daneshmand Re: Valley Ranch Phase IV Water and Sanitary Sewer Dear Shohre: Please find attached, 7 sets of revised plans for the above referenced project. We have addressed Hr. Gabe Favre's comments, a copy of which ia attached, as follova: We have added the future lO-foot by 300-foot right-of-way dedication at the southeast corner of MacArthur Boulevard and Belt Line Road as requested by the City of Coppell. 2.) We have revised the notes on the plan and profile of line WB to include steel encasement in accordance with City of Coppell S rand arda. ~ d changes made durxng eonstruetxon. In our telephone conversation on April 20, 1987 ~ith ~r. Cabe Paure of Oinn, Ine.~ ~e agreed to install a 24 x 12 tee if the existing 26" ~ater hine needs to be extended to meet the proposed 12" llne beneath Belt hine ~. ~hi$ detemlnatlon should be made ~hen the 26" ~ater hlne i$ uncovered in the field prior to construction. TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL SURVEYING