Loading...
Valley R Plaza A-CS 970418DATE: April 18, 1997 TO: Garreth Campbell FROM: Brem Adams RE: Walk thru for COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM McDonald's A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. April 18, 1997 On MacArthur seal curb return's on both sides right turn lane & All saw cut's in curb At MacArthur & Beltline turn radi repair curb damage also sidewalk and BFR missing. On MacArthur S. of Mast arm signal pole uncover & raise to grade pull box that is covered up with grass. Approach seal Redwood header, also off of Pavers S.W. corner seal san cut. Also drop inlet mouth to big 6" max drop inlet has 8" mouth along BF Ramp seal back of curb. Approach off of Beltline seal Redwood Header also install sign at Int. (Right turn only) out of this drive. 8. 9. 10. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg