Loading...
Valley R Plaza A-CS 970418 (2)DATE: TO: FROM: RE: COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM April 18, 1997 Garreth Campbell Larry Smith, Publick Works Walk thru for McDonald's on MacAthur & beltline A walk-thru on the above referenced project was conducted on April 18, 1997 and the items below were found to be deficient. 5. 6. 7. 8. 9. 10. Need to install sewer sample port instead of a property line clean-out. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg RE: Walk thru for COPPEJ J. ENGINE. T~-/NG UTII2TTr.~ DIVISION Ml~fO~ A walk-thru on the above referenc~ project was conducted on and the items below were tbund to be deficient. P!ea.se ensure that the.se items get taken care of and if you have any questions, plebe guve me a call.