Valley R Plaza A-CS 96120904/~8×97 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.663
Address .......
DALLAS REOION DISBURSEMENT ACCOUNT
Decembe~ 6
'AY
'0 THE
)RDER OF
City of Coppell
*l~igh~ Thousand Seven Rundred Twenty-Eiqht & 0.76 ...........
J $ *8,728.76*
oOLLAR$
04/08/9? 09:55 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665
Prepa.,l~l by ,,,
FUND:
CITY OF COPPELL
JOURNAL ENTRY
DATE:
J.E. NO._
POSTED BY:
DATE: __
DESCRIPTION ACCOUNT DR. CR.
NUMBER
.
, U
TOTAL R ~[~ ~: ~'?.~3 ~,
CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL
V ~l'lin Woods
MeOonalds Corporation
511: E, Carpenter Frwy., Suite 375
I,r~,~lng, TX 75062
N0.663
P.O. 8ox 478
Coppell, Texas 7501g
214-462-0022
November 21, 1996
Valley Ranch Plaza, Tract A (McDonalds)
Development Fee Aszessment
L-~.ar Mr Woods
E.l~closed is a copy of the City et Coppcll Development Fee Assessment table, along with a copy
of' thc Development Fee calculations for the referenced development.
P~z~se make payment to the City of Coppell in the amount of $8,728.76 and forward to the
F~nance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
tabl,~, for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so tine comtmction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
pa.l, ment of required fees and insure a successful beginning of this project. We look forward
to ,vorking with you on this project. If you have any questions, please contact me.
CC:
Jennifer Armstrong. Finance Director
Doug Stevens, Engineering Technician
Matt Cast. Supt. of Public Services
Greg/ones, Chief Building Official
Gary Sims, Dir. Leisure Services
09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665 Q05
DEVELOPMENT FEE TABLE
Pro~iect: Valley Ranch Plata, Tract A (McDonalds)
Da~e.: 11/21/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
r Impact Fee $5,625.00 $5,625.00
(100% due prior to Cguncil Approval) LL
X Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
r Meter Fee (Domestic) $134.93
(100% due at Issuance of Water Meter)
~r Meter Fee (Irrigation/Fireline) $2,7 i 5.83
(100% due at Issuance..,,of Water Meter) ,.
r Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
~tion/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Met. er) ,,,
~water Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Apprqyal) . ~.~ .,,
~,~water Tap Inspection Fee $50.00
( 100 % due at Issuance of Building Permit)
'/Final Inspection Fee $50.00
(100 % due at Issuance of Bu.i.!~ing Permit) . ,
i:?ee $0.00 $0.00
(100% due prior to Co, uncil Approval)
way Impact Fee $853.76 $853.76
000% due prior to .Council Approval) ......
[ Light Fee Information not
(100% due prior to Acceptance,of Project available at this time
?'Sign Fee Informalion no~
(100% due prior t_o__Acceptance of Project. axailabte at this time
::'uction InspeCtion Fee Need submmal of
development contracts
,iL $11,929.52
,t!,L AblOUNT DUE PRIOR TO COUNCIL APPROVAL $8,728.76
Water
Wal;e~-
Water
Waltelr
Irrig
Wa~
Utilit'.t
Park
Roi<wa'
Street
Street Si
TOTAL
04/08×9? 09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665 Q04
DEVELOPMENT FEE WORKSHEET
PROJECT: Valley Ranch pin;% Tract A (McDona!dO
DA TE:i: 11/21/96
Water Impact Fee:
Domestic Meter{a}:
Irrigation Meter(s}:
Firaline Meter(a};
1 - I 1/2inch
I -1 1/2inch
1 - 8 inch
5 ESU's
5 ...... ESU's
ESU's
2,5 ESU's
Total #: 12,5 ESU's @ $450.OO ea.
(100% due priOr tO Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter{s) @ $134,93
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (lrrigation/Fireline):
To#at #: 1 ~rrigation Meter(s) ~
Total #: O Additional Irrigation Meter(sD @
Total #: I Fireline Meter(s) ~
{1OO% due prior to issuance of water meters)
$134,93
$2,580.90
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s} @ $30.00 ea,
(100% due prior to issuance of water meterS)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35,00
(100% due prior to issuance of wa#et meters}
Wastewater Impact Fee:
Total Domestic Meters ESU'
5
@ $450.O0ea,
Was:t~water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
'(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(1OO% due prior to issuance of building permit)
$5~625.OO
$150,00 ~
$134.93 ~
$134.93 ~//
$0.OO
92.580.90 '~
$30.00 /
/
$70.00
~$2,250,00 --
$50.00 /
/
$50.00
Page 1
04/08×9? 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.663
D,-VELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
a, Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi*family ~ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
NIA
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
150% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family ~ $1285.00 / Unit
(100% paid prior tO Council approval of final plat)
Roadway b~,pact Fee:
(See attached fee calculations}
St:ceet Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
I100% due prior to final acceptance of development}
N/A
N/A
N/A
N/A
N/A
9853.76
information not
available at ~1i$ tittle
Stree,l: Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
InformatiOn not
available at dli$ 3[~m¢
Constr~lction Inspection Fees:
A copy of the development contract must be submitte0 for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected t)y the Engineering Department.
(2% of development cost required ~'or private improvements)
14% of development cost requirsd for public improvements)
Nsed submittal pt'
development contracts
Page 2
04×08/9? 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0~663 Q06
ROADWAY IMPACT FEE CALCULA'rlONS
DATE:
Valley Ranch Plar~ Tract A (McDonald*)
11/21/96
IJ!~ADWA¥ IM~
Use **
Ft.)
Units **
Miles per Development Unil **
Vehicle Mile ***
Impact Fee due ~ (Development Units)
Vehicle Miles
8
Commercial
Fast Food l~estaurant
3.213
3.213
3,64
$?3
$853.76
(Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
04/08×9? 09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0~665
DEVELOPMENT FEES
ECT NAME:
['VISION DATE:
ISENT
Valley Ranch Plaza, Tract A (McDonald'e}
12/17/96
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone 8
Street Cut Permit
Overtime Inspection
ASSESSED FEE
$5,625.00
$2,250.00
$2,905.28
$853.76
AMOUNT PAID
DATE
$5,625.00 12/9/96
$2,250.00 12/9/96
notify street dept.
$2,905.29 12/16/96
$853.76 1219/96
· notify and copy to Linda Hayes & Utilities Dept. all depoeit faes paid or maters sold
Total Fees Fees Paid Amount Owed
TOTALS $11,634.04 $11,634.04 $0.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O,I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Meant.