Loading...
Valley R Plaza A-CS 96120904/~8×97 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.663 Address ....... DALLAS REOION DISBURSEMENT ACCOUNT Decembe~ 6 'AY '0 THE )RDER OF City of Coppell *l~igh~ Thousand Seven Rundred Twenty-Eiqht & 0.76 ........... J $ *8,728.76* oOLLAR$ 04/08/9? 09:55 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665 Prepa.,l~l by ,,, FUND: CITY OF COPPELL JOURNAL ENTRY DATE: J.E. NO._ POSTED BY: DATE: __ DESCRIPTION ACCOUNT DR. CR. NUMBER . , U TOTAL R ~[~ ~: ~'?.~3 ~, CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL V ~l'lin Woods MeOonalds Corporation 511: E, Carpenter Frwy., Suite 375 I,r~,~lng, TX 75062 N0.663 P.O. 8ox 478 Coppell, Texas 7501g 214-462-0022 November 21, 1996 Valley Ranch Plaza, Tract A (McDonalds) Development Fee Aszessment L-~.ar Mr Woods E.l~closed is a copy of the City et Coppcll Development Fee Assessment table, along with a copy of' thc Development Fee calculations for the referenced development. P~z~se make payment to the City of Coppell in the amount of $8,728.76 and forward to the F~nance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached tabl,~, for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so tine comtmction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the pa.l, ment of required fees and insure a successful beginning of this project. We look forward to ,vorking with you on this project. If you have any questions, please contact me. CC: Jennifer Armstrong. Finance Director Doug Stevens, Engineering Technician Matt Cast. Supt. of Public Services Greg/ones, Chief Building Official Gary Sims, Dir. Leisure Services 09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665 Q05 DEVELOPMENT FEE TABLE Pro~iect: Valley Ranch Plata, Tract A (McDonalds) Da~e.: 11/21/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL r Impact Fee $5,625.00 $5,625.00 (100% due prior to Cguncil Approval) LL X Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) r Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) ~r Meter Fee (Irrigation/Fireline) $2,7 i 5.83 (100% due at Issuance..,,of Water Meter) ,. r Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) ~tion/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Met. er) ,,, ~water Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Apprqyal) . ~.~ .,, ~,~water Tap Inspection Fee $50.00 ( 100 % due at Issuance of Building Permit) '/Final Inspection Fee $50.00 (100 % due at Issuance of Bu.i.!~ing Permit) . , i:?ee $0.00 $0.00 (100% due prior to Co, uncil Approval) way Impact Fee $853.76 $853.76 000% due prior to .Council Approval) ...... [ Light Fee Information not (100% due prior to Acceptance,of Project available at this time ?'Sign Fee Informalion no~ (100% due prior t_o__Acceptance of Project. axailabte at this time ::'uction InspeCtion Fee Need submmal of development contracts ,iL $11,929.52 ,t!,L AblOUNT DUE PRIOR TO COUNCIL APPROVAL $8,728.76 Water Wal;e~- Water Waltelr Irrig Wa~ Utilit'.t Park Roi<wa' Street Street Si TOTAL 04/08×9? 09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.665 Q04 DEVELOPMENT FEE WORKSHEET PROJECT: Valley Ranch pin;% Tract A (McDona!dO DA TE:i: 11/21/96 Water Impact Fee: Domestic Meter{a}: Irrigation Meter(s}: Firaline Meter(a}; 1 - I 1/2inch I -1 1/2inch 1 - 8 inch 5 ESU's 5 ...... ESU's ESU's 2,5 ESU's Total #: 12,5 ESU's @ $450.OO ea. (100% due priOr tO Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter{s) @ $134,93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (lrrigation/Fireline): To#at #: 1 ~rrigation Meter(s) ~ Total #: O Additional Irrigation Meter(sD @ Total #: I Fireline Meter(s) ~ {1OO% due prior to issuance of water meters) $134,93 $2,580.90 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s} @ $30.00 ea, (100% due prior to issuance of water meterS) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35,00 (100% due prior to issuance of wa#et meters} Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.O0ea, Was:t~water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. '(100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (1OO% due prior to issuance of building permit) $5~625.OO $150,00 ~ $134.93 ~ $134.93 ~// $0.OO 92.580.90 '~ $30.00 / / $70.00 ~$2,250,00 -- $50.00 / / $50.00 Page 1 04/08×9? 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.663 D,-VELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): a, Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi*family ~ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A NIA Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) 150% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family ~ $1285.00 / Unit (100% paid prior tO Council approval of final plat) Roadway b~,pact Fee: (See attached fee calculations} St:ceet Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. I100% due prior to final acceptance of development} N/A N/A N/A N/A N/A 9853.76 information not available at ~1i$ tittle Stree,l: Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) InformatiOn not available at dli$ 3[~m¢ Constr~lction Inspection Fees: A copy of the development contract must be submitte0 for assessment. The contracts should indicate the cost to construct the improvements that are inspected t)y the Engineering Department. (2% of development cost required ~'or private improvements) 14% of development cost requirsd for public improvements) Nsed submittal pt' development contracts Page 2 04×08/9? 09:52 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0~663 Q06 ROADWAY IMPACT FEE CALCULA'rlONS DATE: Valley Ranch Plar~ Tract A (McDonald*) 11/21/96 IJ!~ADWA¥ IM~ Use ** Ft.) Units ** Miles per Development Unil ** Vehicle Mile *** Impact Fee due ~ (Development Units) Vehicle Miles 8 Commercial Fast Food l~estaurant 3.213 3.213 3,64 $?3 $853.76 (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 04/08×9? 09:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0~665 DEVELOPMENT FEES ECT NAME: ['VISION DATE: ISENT Valley Ranch Plaza, Tract A (McDonald'e} 12/17/96 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone 8 Street Cut Permit Overtime Inspection ASSESSED FEE $5,625.00 $2,250.00 $2,905.28 $853.76 AMOUNT PAID DATE $5,625.00 12/9/96 $2,250.00 12/9/96 notify street dept. $2,905.29 12/16/96 $853.76 1219/96 · notify and copy to Linda Hayes & Utilities Dept. all depoeit faes paid or maters sold Total Fees Fees Paid Amount Owed TOTALS $11,634.04 $11,634.04 $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O,I. Recd. Const. Plan Approved Irrigation Plan Recd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Meant.