Loading...
Valley R Plaza A-CS 961121The City With A Beautiful Future Verlin Woods McDonaids Corporation 511 E. Carpenter Frwy., Suite 375 Irving, TX 75062 P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 21, 1996 RE: Valley Ranch Plaza, Tract A (McDonalds) : ,~,.,~ v, , : ~, Development Fee Assessment ", IVOV £5 1996 Dear Mr Woods : ...... Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a 66py of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $8,728.76 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, K%M/~r~'P.'E. Assistant City Manager/City Engineer CC: Jennifer Armstrong. Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Valley Ranch Plaza, Tract A (McDonalds) Date: 11/21/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,625.00 $5,625.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,715.83 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $853.76 $853.76 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts I~OTAL $11,929.52 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $8,728.76 b~/VELOPMENT FEE WORKSHE~-T PROJECT: Valley Ranch Plaza, Tract A (McDonalds) DATE: 11/21/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - I 1/2 inch = 5 ESU's 1 - 1 1/2 inch = 5 ESU's = ESU's 1 - 8 inch = 2.5 ESU's Total #: 12.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $134.93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) $134.93 $2,580.90 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $5,625.00 $150.00 $134.93 $134.93 $0.00 $2,580.90 $30.00 $70.00 $2,250.00 $50.00 $50.00 Page 1 b"VELOPMENT FEE WORKSHE,-T Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ 5150.00 / Lot Multi-family @ 575.OO / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 5350.00 / Lot Multi-family @ 5350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ 51285.00 / Lot Multi-family @ 51285.O0 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 5292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A 5853.76 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of devdopment contracts Page 2 ROAD WAY IMPACT FEE CALCULA ~ IONS PROJECT: DATE: Valley Ranch Plaza, Tract A (McDonalds) 11/21/96 ROADWAY IMPACT FEE: Service Area * 8 Category ** Commercial Land Use ** Fast Food Restaurant Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** 3,213 3.213 3.64 $73 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $853.76 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)