Loading...
Valley R Plaza A-CS 940428COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: April 28, 1994 Gary Sieb, Director of Planning & Community Services Steven G. Goram, Director of Public Works Third Replat of Valley Ranch Plaza Pads A-E Plan Review Comments 4 o 5 o No water or sanitary sewer easement required within the property because all lines are private. Need 6" fire line meter. Staff recommends separate irrigation meters to allow cost savings on summer water consumption. Need to know how many and what size meters will be required in order to access impact fees. Irrigation plan also required for final construction plans. Irrigation controller requires freeze protector, rain sensor and surge protection device. Landscape and irrigation plans will conform to the Streetscape Plan. SGG/bc cc: Kenneth Griffin, Assistant City Manager/City Engineer Central File VALLEY.SG