Loading...
TR9501-CS 961220 (3)The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 December 20, 1996 David Mirtaheri Integrated Roadway Services 10701 Shady Trail Dallas, TX 75220 Traffic Signal Installations/MacArthur Blvd. at Parkway Blvd. Project TR 95-01 Dear Mr. Mirtaheri: This letter will serve as your official notice to begin work on the referenced project. For purposes of the contract, your calendar days will start on December 30, 1996 and expire on April 28, 1997. If you should begin work prior to December 30, 1996, then the expiration date of your calendar days will be adjusted accordingly. Larry Davis will be the inspector on this project and can be reached at (972)304-3684. Sincerely, Kenneth M. Griffin, P.E. Director of Public Works/City Engineer cc: Larry Davis, Construction Inspector