Loading...
Warren Addition-CS 940125The City With A Beautiful Future PUBLIC WORKS P.O. Box 478 Coppell, Texas 75019 214-462-0022 January 25, 1994 Mr. Ed Flamburg Sun Valley Homes 2608 Belmeade Carroilton, Texas 75006 Enclosed is a revised copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Warren Crossing. Please provide a check made payable to the City of Copper in the amount of $7,350.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer E.R. Warren, 2215 l~keland Dr., Carrollton, TX 75006 Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg lones, Building Official Doug Stevens, Engineering Technician CITY OF COPP~LL DEVELOPMF~NT FEES/iI~IIgL~D January 2S, 1994 Warren Crossing TOTAL AMOUNT DUE ~ PRIOR TO COUNCIL Water Impact Fee $ 4,550.00 $ 4,550.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 700.00 -0- (100%due at Issuance of Building Permi0 Wastewater Impact Fee $1,575.00 $1,575.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 700.00 -0- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $ 350.00 -0- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $155.75 -0- (100%due at Issuance of Building Permit) Water Meter Deposit $ 210.00 -0- (100%due at Issuance of Building Permit) Street Light Fee * (100%due prior to Acceptance of Project) Park Fee $ 2,450.00 $1,225.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permi0 TOTAL $10,690.75 TOTAL AMOUNT DUE PRIOR TO $ 7,3~0.00 COUNCIL APPROVAL co.station Imp~ioo (2% of Project Cost due psior to preconz~'uction meetiag) * This fee cannot be asaessed until ~ TU Electric submits the lighting plan for the proposed project. Once the plan is submitS. $292.60 per light will be asae~d. COPPELL PUBLIC WORKS ~EHORANDUW FROH : RE: Ken Griffin, P.E., City Engineer Public Works Staff Development Fees for Warren Crossing The following fees referenced project. Water Imlmm~'t Fee: 7 - 5/8" x 3/4" m Total 7 100% due prior to Council should be assessed and collected on the above Domestic Meter/s = ? ESU's Irrigation Meter/s :__ESU's Fireline Meter/s =__ESU's ESU's ~ $650.00 ea = approval of the final plat. WastewaterImpa~t (WUD) 7 - 5!~,,v9/4, Domestic Meter/s = Total ? ESU's ~ $225.00 ea = 100% due prior to Council ? ESU's $1.575.00 approval of final plat. WastewaterIl~a~t (City) - Domestic Meter/s = Total ESU's ~ $450.00 ea = ESU's 100% due prior to Council approval of the final plat. Water Tap Inspection Fee ? Connections @ $100.00 each = 100% due'prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee ? Connections ~ $100.00 each = ~O0.O0 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Dvelop~ent) ? lots ~ $50,QO/lot = 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 7 - ~/""~/4" Domestic Meters @ ~_~5 ea = $155.75 10O% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) ____ - ,.. Irrigation Meter/s ~ $ ._ ~ ea ~ $~_ , __ - Fireline Meter/s ~ $ ea - $ 100% due prior to issuance of water meter/s. Water HeterDeposit (Residential) 7 Meters ~ $30.00 ea = _~ 100% due prior to issuance of building permit. Water HeterDeposit (~ulti-Fa~ily or Non-Residential) Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ S35.00 ea = $ 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: .Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $' 50% of the amount specified above shall be paid by the Developer/ prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 7 Residential Lots at $350.00 each = $2,450.00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Stevan G. Goram, Director of Public Works G. GregJones, Chief Building Official Development Fees Page 5 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. No Parking Speed Limit Yield Stop Street Name Stop & Street Co~o OTHER $53.10 $63.54 S58.56 $96.85 Cost breakdowns may be obtained from request. Public Works by written DEVFEES.HLP Revised 1/14/94