Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Warren Crossing.
Please provide a check made payable to the City of Coppell in the amount of $8,400.00 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List.
Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look fo~vard to working with you on this project. If you have any questions, please do not
hesitate to contact me~
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
D~te:
January 17, 1994
Warren Crossing
CITY OF COPPELL
DEVR~IOPMENT
TOTAL AMOUNT DUE
A~SMENT PRIOR TO
COUNCIL
Water Impact Fee $ 5,200.00 $ 5,200.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 800.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee $1,800.00 $1,800.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $ 800.00 -0-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $ 400.00 -0-
(100%due at Issuance of Building Permi0
Water Meter Fee (Lots) $178.00 -0-
(100%due at Issuance of Building Permit)
Water Meter Deposit $ 240.00 -0-
(100%due at Issuance of Building Permit)
Street Light Fee *
(100%due prior to Acceptance of Project)
Park Fee $ 2,800.00 $1,400.00
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL $12,218.00
TOTAL AMOUNT DUE PRIOR TO $
COUNCIL APPROVAL
Constm~on In~pecaon Fee
(2W of Project Cozt due lniot to
This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed Pmj~t- Once the plan
is submitted, $292.60 per light will be assessed.
DATH :
COPPELL PUBLIC WORKS
MEMORANDUM
January 10, 1994
Ken Griffin, P.E., city Engineer
Howard L. Pafford, Utilities Superintenden~
Irrigation Fees for Warren Crossing
The following fees should be assessed and collected on
referenced project.
Water Impact Fee:
8 - 5/8" x
Domestic/Irrigation Meter/s = 8
Irrigation Meter/s = __ESU's
the above
ESU's
Total 8 ESU's ~ $650.00 ea = $5,200.00
100% due prior to Council approval of the final plat.
WastewaterImpact (WUD)
8 - 5/S" x 3/4" Residential Meters = 8 ESU's
Total 8 ESU's ~ $225.00 ea = $1.800.00
100% due prior tJcoUncil approval of the final plat.
Water Tap Inspection Fee
8 Connections ~ $100.00 each = $800.00
100% due prior to issuance of meter/s.
Sewer Tap Inspection Fee
8 Connections @ $100.00 each = S800.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee
8 lot @ SSO.O0/lot = $400.00
Water Meter Fee (Lots)
8 -- 5/8" X 3/4" Residential Meters ~ S22.25
100% due prior to issuance of building permit.
= $178.00
Water KeterDeposit
8 meters ~ $30.00 ea = $240.00
lOO% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Park Fee
Residential Lots at $350.00 each = S 2,800.00
Units (Multi family) at $350.00 each = $
For those developments having preliminary plat approval after
October 26, 1993, the following assessment is determined:
Residential lots at $1,285.00 ea = $
Units (Multi-Family) at $1,285.00 ea = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments, please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE
No Parking $53.10
Speed Limit S63.54
Yield S58.56
Stop S65.12
Street Name $31.60
Stop & Street Combo $96.85
OTHER
No Outlet [30"; S65.12
No Outlet Blade S11.60
OUANTITY
n/a
EXTENDED PRICE
Cost breakdowns may be obtained from Public Works by written
request.
FEES.HLP/WARREN