Loading...
Warren Addition-CS 940117J'l'he City With A Beautiful Future l i"~;"-'C'~Z ~ORKS January 17, 1994 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Eugene Middleton Winkleman & Associates 12800 l:lillerest Road Suite 200 ~Asses~ent Dear Mr. Mid&eton: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Warren Crossing. Please provide a check made payable to the City of Coppell in the amount of $8,400.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look fo~vard to working with you on this project. If you have any questions, please do not hesitate to contact me~ Sincerely, Kenneth M. Griffin, P.E. City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician D~te: January 17, 1994 Warren Crossing CITY OF COPPELL DEVR~IOPMENT TOTAL AMOUNT DUE A~SMENT PRIOR TO COUNCIL Water Impact Fee $ 5,200.00 $ 5,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $1,800.00 $1,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $ 400.00 -0- (100%due at Issuance of Building Permi0 Water Meter Fee (Lots) $178.00 -0- (100%due at Issuance of Building Permit) Water Meter Deposit $ 240.00 -0- (100%due at Issuance of Building Permit) Street Light Fee * (100%due prior to Acceptance of Project) Park Fee $ 2,800.00 $1,400.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $12,218.00 TOTAL AMOUNT DUE PRIOR TO $ COUNCIL APPROVAL Constm~on In~pecaon Fee (2W of Project Cozt due lniot to This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed Pmj~t- Once the plan is submitted, $292.60 per light will be assessed. DATH : COPPELL PUBLIC WORKS MEMORANDUM January 10, 1994 Ken Griffin, P.E., city Engineer Howard L. Pafford, Utilities Superintenden~ Irrigation Fees for Warren Crossing The following fees should be assessed and collected on referenced project. Water Impact Fee: 8 - 5/8" x Domestic/Irrigation Meter/s = 8 Irrigation Meter/s = __ESU's the above ESU's Total 8 ESU's ~ $650.00 ea = $5,200.00 100% due prior to Council approval of the final plat. WastewaterImpact (WUD) 8 - 5/S" x 3/4" Residential Meters = 8 ESU's Total 8 ESU's ~ $225.00 ea = $1.800.00 100% due prior tJcoUncil approval of the final plat. Water Tap Inspection Fee 8 Connections ~ $100.00 each = $800.00 100% due prior to issuance of meter/s. Sewer Tap Inspection Fee 8 Connections @ $100.00 each = S800.00 100% due prior to issuance of building permit. Utility Final Inspection Fee 8 lot @ SSO.O0/lot = $400.00 Water Meter Fee (Lots) 8 -- 5/8" X 3/4" Residential Meters ~ S22.25 100% due prior to issuance of building permit. = $178.00 Water KeterDeposit 8 meters ~ $30.00 ea = $240.00 lOO% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Park Fee Residential Lots at $350.00 each = S 2,800.00 Units (Multi family) at $350.00 each = $ For those developments having preliminary plat approval after October 26, 1993, the following assessment is determined: Residential lots at $1,285.00 ea = $ Units (Multi-Family) at $1,285.00 ea = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments, please advise. HLP/dm cc: Steven G. Goram Director of Public Works STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE No Parking $53.10 Speed Limit S63.54 Yield S58.56 Stop S65.12 Street Name $31.60 Stop & Street Combo $96.85 OTHER No Outlet [30"; S65.12 No Outlet Blade S11.60 OUANTITY n/a EXTENDED PRICE Cost breakdowns may be obtained from Public Works by written request. FEES.HLP/WARREN