Loading...
Warren Addition-CS 940110COPP~nn PUBLIC WORKS HE~ORANDU~ January 10, 1994 Ken Griffin, P.E., City Engineer Howard L. ~tenden~ Paffor~~I Irrigation Fees The fOllowing fees should be assessed and collected on the above referenced project. Water Impact Fee: ~ - 5/8" x 3/4" Domestic~Irrigation Meter/s = ~ESU's Irrigation Meter/s = ESU's Total ~ ESU's ~ $650.00 ea = S5.~0.00 / 100% due prior to Council approval of the final plat. Wastewater Impact (MUD) ~_~ - 5/8" x 3/4" Residential Meters = 7,~/ ESU's Total 7.~ ESU's ~ $225.00 ea = $1.~0.00 15~ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee /V~ ~y Connections @ $100.00 each = ~00.00 100% due prior to issuance of meter/s. Sewer Tap Inspection Fee ~ Connections @ $100.00 each =~0.00 100% due prior to issuance of building permit. Utility Final Inspection Fee ~ ~ ~ lot 5o.oo/lot = sJo.oo / Water Meter Fee (Lots)  - $/8" X 3/4" Residential Meters ~ S22.25 100% due prior to issuance of building permit. Water Heter Deposit ~-) D~'~ l~ meters @ $30.00 ea = $2~0.00/ ~ 100% due prior to issuance of building permit. = S17~.00 / Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Park Fee ~._~ JO 7 /~, Residential Lots at $350.00 each = S/2~.800.00 Units (Multi family) at $350.00 each = $ For those developments having preliminary plat approval after October 26, 1993, the following assessment is determined: Residential lots at $1,285.00 ea = $ Units (Multi-Family) at $1,285.00 ea = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments, please advise. HLP/dm cc: Steven G. Goram Director of Public Works STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER No Outlet UNIT PRICE S53.10 $63.54 $5 .56 $65.12 $11.60 $96.85 $65.12 $11.60 QUANTITY n/a EXTENDED PRICE No Outlet Blade TOTAL Cost breakdowns may be obtained from Public Works by written request. FEES.HLP/WARREN COPPELL PUBLIC WORKS DATE: TO: FROM: RE: Ken Griffin, P.E., city Engineer Public Works Staff Development Fees for Warren Crowing The following fees referenced project. Water Iipa~tFee: ? - Total ? should be assessed and collected on the above Domestic Meter/s = ? ESU's Irrigation Meter/s = ESU's Fireline Meter/s = ESU's ESU's ~ $650.00 ea = $$4.550.N0 100% due prior to Council approval of the final plat. WastewaterImpact (~UD) 7 - 5.;~,,v~./4,, Domestic Meter/s = Total ? ESU's ~ $225.00 ea = 100% due prior to Council approval of final 7 ESU's $1,575.00 plat. Wastewater Impact (City) - Domestic Meter/s = ESU's Total ESU's @ $450.00 ea = $ 10~% due prior to Council approval of the final plat. Water Tap Inspection Fee ? Connections @ $100.00 each = 100% due 'prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee ? Connections ~ $100.00 each = ~00.00 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Dvelopment) ? lots ~ ~ = $350.00 100% due prior to issuance of building permit. Water HeterFee (Domestic) 7 - ~/""v~.14" Domestic Meters @ ~_~ ea = $155.75 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) - Irrigation Meter/s ~ $ ..... - Fireline Meter/s @ $ 100% due prior to issuance of water meter/s. ea = S~ _ ea = $ Water Meter Deposit (Residential) ? Meters ~ $$0.00 ea = $210.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) Meters ~ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Develo~ll~ent Fees Page 3 Pa.~k Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: · Residential Lots at $150.00 each = $ units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 7 Residential Lots at $350.00 each = $2~450.00 Units (Multi-Family) at $350.00 each = $ 50% of theamount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. .Please advise the Developer of these fees and due dates. If you have any qUestions regarding these assessments please advise. Street Lighting Fee shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street $igns Fee See attached Street Sign Assessment sheet. lOO% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official Develo~lent Fees Page 5 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER $53.10 $58.56 $6s.12 $11.60 $96.85 EXTENDED PRICE Cost breakdowns request. TOTAL may be obtained from Public Works by written DEVFEES.HLP Revised 1/14/94 01724/94 $~_.x09:/~5~ CITY OF COPPELL ~ ~ ~l~ ~,0, BOX 478 :!14-4~-0022 II~ ~ fA(~,~ (IIICLUDI. ItG COVEI ,I Please advise the Developer of theme fees and due dates. ~teven G. Gorsm Dire=tut of Publi~ Works F~ES. HLP/WARREN