Warren Addition-CS 940110COPP~nn PUBLIC WORKS
HE~ORANDU~
January 10, 1994
Ken Griffin, P.E., City Engineer
Howard L. ~tenden~
Paffor~~I
Irrigation Fees
The fOllowing fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
~ - 5/8" x 3/4" Domestic~Irrigation Meter/s = ~ESU's
Irrigation Meter/s = ESU's
Total ~ ESU's ~ $650.00 ea = S5.~0.00
/
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
~_~ - 5/8" x 3/4" Residential Meters = 7,~/ ESU's
Total 7.~ ESU's ~ $225.00 ea = $1.~0.00 15~
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee /V~
~y Connections @ $100.00 each = ~00.00
100% due prior to issuance of meter/s.
Sewer Tap Inspection Fee
~ Connections @ $100.00 each =~0.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee ~ ~ ~
lot 5o.oo/lot = sJo.oo
/
Water Meter Fee (Lots)
- $/8" X 3/4" Residential Meters ~ S22.25
100% due prior to issuance of building permit.
Water Heter Deposit ~-) D~'~
l~ meters @ $30.00 ea = $2~0.00/ ~
100% due prior to issuance of building permit.
= S17~.00
/
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Park Fee ~._~ JO
7 /~, Residential Lots at $350.00 each = S/2~.800.00
Units (Multi family) at $350.00 each = $
For those developments having preliminary plat approval after
October 26, 1993, the following assessment is determined:
Residential lots at $1,285.00 ea = $
Units (Multi-Family) at $1,285.00 ea = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments, please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
No Outlet
UNIT PRICE
S53.10
$63.54
$5 .56
$65.12
$11.60
$96.85
$65.12
$11.60
QUANTITY
n/a
EXTENDED PRICE
No Outlet Blade
TOTAL
Cost breakdowns may be obtained from Public Works by written
request.
FEES.HLP/WARREN
COPPELL PUBLIC WORKS
DATE:
TO:
FROM:
RE:
Ken Griffin, P.E., city Engineer
Public Works Staff
Development Fees for Warren Crowing
The following fees
referenced project.
Water Iipa~tFee:
? -
Total ?
should be assessed and collected on the above
Domestic Meter/s = ? ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = ESU's
ESU's ~ $650.00 ea = $$4.550.N0
100% due prior to Council approval of the final plat.
WastewaterImpact (~UD)
7 - 5.;~,,v~./4,, Domestic Meter/s =
Total ? ESU's ~ $225.00 ea =
100% due prior to Council approval of final
7 ESU's
$1,575.00
plat.
Wastewater Impact (City)
- Domestic Meter/s = ESU's
Total ESU's @ $450.00 ea = $
10~% due prior to Council approval of the final plat.
Water Tap Inspection Fee
? Connections @ $100.00 each =
100% due 'prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
? Connections ~ $100.00 each = ~00.00
100% due prior to issuance of building permit.
(Residential only)
Utility Final Inspection Fee (Ail Dvelopment)
? lots ~ ~ = $350.00
100% due prior to issuance of building permit.
Water HeterFee (Domestic)
7 - ~/""v~.14" Domestic Meters @ ~_~ ea = $155.75
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
- Irrigation Meter/s ~ $ .....
- Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
ea = S~ _
ea = $
Water Meter Deposit (Residential)
? Meters ~ $$0.00 ea = $210.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Develo~ll~ent Fees
Page 3
Pa.~k Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
· Residential Lots at $150.00 each = $
units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
7 Residential Lots at $350.00 each = $2~450.00
Units (Multi-Family) at $350.00 each = $
50% of theamount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
.Please advise the Developer of these fees and due dates.
If you have any qUestions regarding these assessments please advise.
Street Lighting Fee
shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Development Fees
Page 4
Street $igns Fee
See attached Street Sign Assessment sheet.
lOO% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official
Develo~lent Fees
Page 5
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the city of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
$53.10
$58.56
$6s.12
$11.60
$96.85
EXTENDED PRICE
Cost breakdowns
request.
TOTAL
may be obtained from
Public Works
by written
DEVFEES.HLP Revised 1/14/94
01724/94 $~_.x09:/~5~ CITY OF COPPELL ~ ~ ~l~
~,0, BOX 478
:!14-4~-0022
II~ ~ fA(~,~ (IIICLUDI. ItG COVEI
,I
Please advise the Developer of theme fees and due dates.
~teven G. Gorsm
Dire=tut of Publi~ Works
F~ES. HLP/WARREN