Loading...
Villages of CC P5-PT 970207Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l - Public Works Department Date: 2 / ~ / q7 Project Name: 71'//~f ~ ~D~O ~/~ S~C7t'~/~ Permit Issued To: Name: Address: Pkone: ~er~ency Phone ~3~pe of Work/General Description: Have ,~!l City and/or Franchise utilities Been Contacted and YES Existinq Utilities Located: Will It Be Necessary to Excavate Pavement? YES (attach Street, Alley or Sidewalk permit) ~NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. ~rea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa_~tments prior to closing (.%62-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PER/~iT Attach Barricading/Detour Plan if a lane or street closure is ~pplicable. Franchise/Contractor Repr.~tive Date Franchise Inspector/or City Inspector Approved/City Reores e.~C~~ve Date Date ..... Applicant shall indemnify and forever hold harmless against each and eve~; claim, demand or cause of ac~ion that may be made or come against £t by reason of er if any way arising out of the closure, blockinq, excavating, cutting, tunneling, or other work by the applicant under pe-~rn, it from the City, if such permit is granted. P EP~IT. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NOW-ET BORES ALLOWED!