Loading...
ST8401-CS 880624June The City With A Beautiful Future 24, 1988 R O. Box 478 Coppell, Texas 75019 214 - 462-9010 Bobby Harrell Terra Companies 5944 Luther Lane Suite 2502 Dallas, Texas 75225 RE: Difficient items to be resolved for the acceptance of MacArthur Blvd. from Coppell/Irving city limits to the MacArthur Blvd. tie in at Woodridge Section 4 Dear Mr. Harrell: As per your request for a letter explaining what it will take to sell this project to the City, please find the following list of difficient items needing to be resolved. On June 23, 1988, Public Works, Water Utilities, Streets and Parks departments performed a verification of punch list items submitted to Nathan Maier on September 24, 1987, to be completed for final acceptance. The following are the remaining items that as of this date have not been accomplished. Water Utilities Department 2) Jet rod and vacuum sewer main free of mud and standing water. 4) 25 + 34.50 - Manhole ring needs to be reset and manhole cleaned out. 6) 20 + 00 24" Valve needs extension 8) 25 + 00 24" Valve covered up. 11) 6 + 50 Line "A" not able to locate manhole. Fire Department Ail 4 punch list items have been satisfactorily addressed. Sign/Signals Department 4) Due to poor application of railroad symbols and stop bar, they have worn off. - The signal pole that was destroyed by a truck has been handled by the truck's insurance and will be installed in July. This item should not hold up acceptance. The other 3 items have been satisfactorily addressed. Street Department 3) Many of the curbs have chips missing. Ail should be with sikitop. The patches are not holding and will need to be redone. other 5 items have been satisfactorily addressed. The Parks Department repaired The landscaping in the 2 medians, south of Beltline/MacArthur intersection to the city limit line at the bridge still has not been resolved. Additional Items (Walk-thru 6/23/88) 1) Sidewalk cracked in 7 locations. 2) 4' random crack east side under 2nd power line. 3) Mud ball holes south of Riverchase. 4) Spalling 2nd panel south of 2nd entrance from the north end. 5) Pave stones missing around sanitary sewer manhole southwest corner, 1st entrance. appreciated. Your cooperation is greatly Thank you, Steven M. Morton Chief Development Inspector SMa/sm CC: Steve Goram, Director of Public Works Howard Pafford, Water Foreman Per Birdsall, Street Foreman Richard Diano, Park Foreman Dana Kamp, Sign/Signalization Technician Jean Maier, Nathan Maier Co.