Loading...
Woodridge-CS 890616COPPELL PUBLIC WORKS MEMORANDUM June 16, 1989 TO: Steve Goram, Director of Public FROM: Per Birdsall, Street Foreman RE: SUB: Woodridge Channel The lined section channel was cleaned of an average depth of an material several years ago. The operation took several weeks because of inadequate equipment to perform the work. At present, I have neither the manpower or the equipment to address the silted in condition and growth at the joints ( a gradall and a drump truck would be the equipment of choice). I have however requested my right-of-way crew to attempt to pull the weeds from the joints but without resealing (hot pour needed because of the slops), growth recurs. PHB/bb