Loading...
Villages of CC 6-CS 941220 (2),~/' ~ The L,,ty With A Bea,at~'_, =.'' k -7,/ ,,',' December 20, 1994 Mr. Richard Hovas Tipton Engineering 6330 Beltline Road, Suite Dear Mr.X-H.~as: ~ 2'4 A62-1,122 As per our telephone conversation, a preconstruction conference on the referenced project has been scheduled for 9:00 a.m., December 28, 1994 in the downstairs conference room at City Hall (255 Parkway Blvd.). Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you should have any questions concerning this project, please feel free to call me at (214) 393-1016, Ext. 297. Sincerely, Construction Inspector CC: Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Troy Glidewell, Fire Marshal Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works Mike Martin, Graduate Engineer Atul Patel, Graduate Engineer