Villages of CC 6-CS 941101DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
November 1, 1994 ~
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintende ~ ~
Development Fees forages of cottonwood cree
The following fees
referenced project.
Water Impact Fee:
184 - 5/8" x 3/4"
1 2"
Total 192
100% due prior to Council approval of
should be assessed and collected on the above
Domestic Meter/s = 184 ESU's
Irrigation Meter/s = 8 ESU's
ESU's @ $650.00 ea = $ 124,800.00
the final plat.
Wastewater Impact
184 5/8" x 3/4" Domestic Meter/s =
Total 184 ESU's ~ $450.00 ea =
184 ESU's
$ 82,800.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
185 Connections ~ $100.00 each = $ 18,500.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
184 Connections ~ $i00.00 each = $18,400.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
184 lots @ $50.00/10t = $9,200.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
184 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $4,094.00
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation)
1 - 2 Irrigation Meter/s @ $ 189.10ea
100% due prior to issuance of water meter/s.
= $ 189.10
Water Meter Deposit (Residential)
184 Meters @ $30.00 ea = $5,520.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit.F~
1 Meters @ $35.00 ea = $35.00
100% due prior to issuance of water meters.
Note: These calculations do not include water fees for irrigation
meters. Sizes were not available.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
--J~L~_Residential Lots within Park Zone 1 at $1,285.00 each ~
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Development Fees
Page 4
Street Lighting Fee
Shall
Note:
be assessed and paid prior to final acceptance of project.
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 5
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which
SIGN
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
No outlet(30"Diamond 63.54
No outlet(blade) 11.60
is reviewed on a regular basis.
UNIT PRICE QUANTITY
$53.10
$63.54 44
$58.56
$65.12
$11.60
$96.85 16
EXTENDED PRICE
$2,795.76
1,549.60
254.16
34.80
* Cost breakdowns may be
request.
TOTAI~
obtained from
Public
$4,634.32
Works by written
VILLAGESVI Revised 1/14/94