Loading...
Villages of CC 6-CS 941101 (3)DATE TO: FROM RE: November 1, 1994 COPPELL PUBLIC WORKS MEMORANDUM Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Villages of Cottonwood Creek Section VI The following fees referenced project. Water Impact Fee: 184 - 5/8" x 3/4" 1 2" Total 192 should be assessed and collected on the above Domestic Meter/s = 184 ESU's Irrigation Meter/s = 8 ESU's % ESU's @ $650.00 ea = $ 124.800.00 100% due prior to Council approval of the final plat. Wastewater Impact 184 5/8" x 3/4" Domestic Meter/s = Total 184 ESU's @ $450.00 ea = 184 ESU's $ 82,800.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 185 Connections ~ $100.00 each = $ 18,500.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 184 Connections ~ $100.00 each = $18,400.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 184 lots @ $50.00/lot = $9.200.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 184 5/8" X 3/4" Domestic Meters ~ 22.25~ea = $4.094.00 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation) i - 2 Irrigation Meter/s ~ $ 189.10ea 100% due prior to issuance of water meter/s. = $ 189.10 Water Meter Deposit (Residential) 184 Meters ~ $30.00 ea = S5.520.00 100% due prior to issuance of building permit. Irrigation Meter Deposit N/A 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. Note: These calculations do not include water fees meters. Sizes were not available. for irrigation Development Fees Page 3 Park Fee For those developments having preliminarypiat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: 184 Residential Lots within Park Zone 1 at $1,285.00 each = $236,440 Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Development Fees Page 4 Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 5 STREET SIGN ASSESSMENT for The following assessment is being made in accordance ~ith the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 44 $2,795.76 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 16 1,549.60 OTHER No outlet{30"Diamond 63.54 4 254.16 No outlet{blade; 11.60 3 34.80 TOTAL $4,634.32 * Cost breakdowns may be obtained from Public Works by written request. VILLAGESVI Revised 1/14/94