Loading...
Villages of CC 6-CS 940809ENGINEERING, INC. 6330 Belt Line Road ~SuiteC August 9, 1994 Mr. Gary Sieb Director of Planning SURVEYING · PLANNING 4040 · Garland, Texas 75043 · (2t4) 226 2967 · FAX 226 1946 CITY OF COPPELL 255 p~?_~;,ard ~ L ....... ~l, Texas 75019 ~~ Re: VILLAGE AT COTTONWOOD CREEK, SECTION VI, PRFjLIMINARY PLAT ~~p~ELL, TEXAS ~ Dear Mr. Sieb: Please fred listed below the responses to the Development Review Committee meeting which was held on Thursday, August 4, 1994. I. PLANNING DEPARTMENT COMMENTS: 1. We have reflected current zoning of the site. 2. We have reflected surrounding property ownership and zoning. 3. We have revised the cul-de-sac access abutting Parkway Boulevard. 4. We have included legal description of the property. We have provided preliminary water and sewer and drainage layouts and have coordinated with electric, gas and telephone. We will be providing a solid mason~ 6' screening wall along Parkway Boulevard and Coppell Road, along with appropriate landscaping as required by the City of Coppell Streetscape Ordinance. 7. We have delineated floodplain on the plat. It is our proposal to construct an 8' Hike and Bike Trail along with construction of lake systems in the Denton Creek Floodplain. We have identified any 8" or larger trees located on the developable property. Mr. Gary Sieb August 9, 1994 Page No. 2 10. We have provided preliminary screening wall and landscape plans along Coppell Road and Parkway Boulevard. 11. We have provided the needed street names. 12. We have submitted a Preliminary Property Owners Association Agreement. 13. We have submitted a I sndscape Plan and Tree Preservation Plan. 14. We have identified the alley along the eastern property line. 15. We have submitted a fomml letter of abandonment of alleys along the Denton Creek Floodplain Area. 16. We have identified this document as a replat instead of a preFuninary plat. 17. We are attaching twenty-six (26) folded copies, three (3) reduced paper copies and one (1) transparencies of each exhibit. PUBLIC WOl~lCq COMMENTS: 1. We will be providing a 20' wide Hike and Bike Trail Easement along with construction of an 8' concrete trail. 2. The Hike and Bike Trail location will be coordinated with the Parks and Recreation Division. 3. The ParkLand fees will be paid subject to the original payment under the original platting process. 4. The 12~ sewer line along the eastern property is adequate in size to accommodate for their flow. 5. We have provided water and wastewater flow demands. 6. We have eliminated the curves on the sanitary sewer systems. 7. We have tied in all deadend water lines. 8. We have redesigned the street system to accommodate for the 90" storm sewer system. Mr. Gary $ieb August 9, 1994 Page No. 3 ENG1N~,E1HNG DEPARTMENT COMMENTS: 1. We will be providing a 20' wide Hike and Bike Trail Easement along with comU'uction of an 8' concrete trail. 2. We have identified the Denton Creek Floodplain. 3. We have provided access to the Denton Creek Floodplain and Common Area. 4. We will need to work with adjacent property owners of off-site drainage discharge. 5. We have identified floodplain adjacent to Lot 13. 6. We are aware of the escrow requirements of Coppell Road. 7. We have shown all the medlam on Parkway Boulevard. 8. We have coordinated the alleys on our eastern property requirement with Copperstone Subdivision. 9. We have redesigned the alley configuration between Lots 80 and 81. 10. We have redesigned the alley configuration between Lots 13 and 14. 11. We will be providing solid screening along Parkway Boulevard. 12. We have redesigned the street configuration to provide for proper access to the east and proper circulation to the west. 13. We have identified the minimum finish floor along Denton Creek Floodplain. 14. We have redesigned the street configuration to provide for proper access points into Parkway Boulevard. 15. We have identified the drainage across Coppell Road adjacent to Lot 13. Mr. Gary Sieb August 9, 1994 Page No. 4 16. 17. 18. 19. 20. We have redesigned our street system to accommodate for the 90" storm sewer system. We have identified the drainage areas on the drainage map. Our storm sewer systems will enter east to the proposed lake systems and creek areas. We have added manholes to the 8" sewer lines in lieu of cleanouts. We will be connecting the 8" water lines to the system in Parkway Boulevard. 21. The plat will be identified as a replat. This concludes our review of staff comments. If you have any questions or if we can furnish additional information, do not hesitate to contact our office. ,:/ G G, INC. PA:ea At~achmeuts