Loading...
Villages of CC 6-CS 950804DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: Villages of Cottonwood Creek Section VI Tipton Engineering, Inc. 8/4/95 SENT 11/1/94 11/1/94 11/1/94 11/1/94 3123/95 ASSESSMENT Park Fee (Assessed @ $13,800.00) Water Impact Fee (Assessed @ $~1,~4 800,00_)_ Wastewater Impact Fee (Assessed @ _$82,800.00) Street Sign Street Light Construction Insp(Grading) Construction Inspection Irrigation ASSESSED FEE $13,725.00 $124,150.00 ~82,350.00 $4,634.32 $9,948.40 $384.00 $31,596.75 11/1/94 Street Escrow $53,901.10 1/26/95 Overtime Inspection (1/21 ) $174.00 2/20/95 Overtime Inspection (2/4) $232.00 2/27/95 Overtime Inspection (2/18) $232.00 3/13/95 Overtime Inspection (3/11 ) $232.00 3/23/95 Overtime Inspection (3/18) $232.00 5/15/95 Overtime Inspection (5/13) $116.00 5/22/95 Overtime Inspection (5/20) $116.00 6/5/95 Overtime Inspection (6/3) $116.00 7/14/95 Overtime Inspection (7/8) $60.00 Total Fees TOTALS $322,199.57 AMOUNT PAID DATE $13,725.00 12/14/94 $124,150.000~ 12/14/94 $82,350.00 ~' 12/14/94 $53,901.10 12/14/94 $174.00 2/15/95 $232.00 3/1/95 $232.00 4/26/95 $232.00 4/26/95 $232.00 4/20/95 $116.00 6/19/95 $116.00 6/27/95 $116.00 7/10/95 Fees Paid Amount Owed $317,505.25 $4,694.32 NOTES * See letter received from Tipton Engineering, Inc. 1/12/95 w/plans 12/2/94 1/12/95 10/2O/94 Prior To Construction Erosion Control Approved E.P,A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.