DR9305-CS 9307155. Flood Boundaries and 10
RIVERINE MAPPING FORM
Has the 100-year floodpl
increased at any location
If yes, please give the loc
PROPOSED INCREASE
FLOOD ELEVATIONS ARE ON THE REQUESTORS PROPERTY
ater surface elevation
~unity's?
[-"] 'Yes ~ No
r the increase.
EXISTING
bo
Have the affected property owners been notified of this shift or increase and the effect it
will have on their property? ~] Yes [] No
If yes, please attach letters from these property owners stating they have no objections to
the revised flood boundaries.
SEE ATTACHED
What is the number of insurable structures that will be impacted by this shift or
increase? ZERO
o
Have the floodway boundaries shifted or increased at any location compared to those shown on
the effective FBFM or FIRM? f~ Yes [] No
If yes, explain:
EFFECTIVE FIS IGNORED THE EXISTING~ NATURALLY CREATED BY-PASS
CHANNEL WHICH CARRIES A LARGE PART OF THE DISCHARGE BUT WAS
EXCLUDED FROM THE FLOODWAY IN THE EFFECTIVE FIRM
Manual or digital map submission:
~ Manual
[] Digital
Digital map submissions may be used to update digital FIRMs (DFIRMs). For updating
DFIRMs, these submissions must be coordinated with FEMA Headquarters as far in advance of
submission as possible.
October 1992 Pao~ 2 of 3
RIVERINE MAPPING FORM
Mapping Changes (Continued)
Flood Boundaries and lO0-year water surface elevations:
Has the lO0-year floodplain been shifted or increased or the lO0-year water surface elevation
increased at any location on property other than the requestor's or community's?
[--'] Yes ~ No
I£yes, please give the location of shift or increase and an explan~, tion for the increase.
PROPOSED INCREASED FLOOD ELEVATIONS ABOVE THE REVISED EXISTING
FLOOD ELEVATIONS ARE ON THE REQUESTORS PROPERTY
Have the affected property owners been notified of this shift or increase and the effect it
will have on their property? :~ Yes [-] No
If yes, please attach letters from these property owners stating they have no objections to
the revised flood boundaries.
SEE ATTACHED
What is the number of insurable structures that will be impacted by this shift or
increase? ZERO
Have the floodway boundaries shifted or increased at any location compared to those shown on
the effective FBFM or FIRM? [~] Yes [] No
If yes, explain:
EFFECTIVE FIS IGNORED THE EXISTING, NATURALLY CREATED BY-PASS
CHANNEL WHICH CARRIES A LARGE PART OF THE DISCHARGE BUT WAS
EXCLUDED FROM THE FLOODWAY IN THE EFFECTIVE FIRM
Manual or digital map submission:
~] Manual
[--] Digital
Digital map submissions may be used to update digital FIRMs (DFIRMs). For updating
DFIRMs, these submissions must be coordinated with FEMA Headquarters as far in advance of ~
submission as possible.
October 1992 Pag~ 2 of 3
A~P LICATION/C~elCATION ~ FOR CONI~TI(~AL ~ OF MAP ~.~'V]~XO~. L~"Tr~Zt Olv M~I~IIlI'V~(~( ~ t.i.t I~.q,,L ~ ~
Community Name:
Flooding Source:
FEMALE ONLY
RIVERINEMAPPINGFORM
CITY OF COPPELL~ TEXAS
GRAPEVINE CREEK
REV.
FORM
7/15/93
Project NameAdentifier: GRAPEVINE SPRINGS PARK
Mapping Changes
A topographic work map of suitable scale, contour interval, and planimetric definition must be
submitted showing (insert N/A when not applicable):
A. Revised 100- year floodplain boundaries (Zone A)
B. Revised 100- and 500-year floodplain boundaries
C. Revised 100-year floodway boundaries
D. Location and alignment of all cross sections used in the revised
hydraulic model with stationing control indicated
E. Stream alignments, road and dam alignments
F. Current community boundaries
G. Effective 100- and 500-year floodplain and 100-year floodway
boundaries from the FIRM/FBFM reduced or enlarged to the
scale of the topographic work map
H. Tie-ins between the effective and revival 100- and 500-year
floodplains and 100-year floodway boundaries
I. The requestor's property boundaries and community easements
J. The signed certification ora registered professional engineer
K. Location and description of reference marks
L. Vertical datum (example: NGVD 1929, NAVD 1988, etc.)
Included
[~] Yes ["-[ No ['~ N/A
[] Yes [] No [] N/A
[] Yes [~ No [] N/A
[] Yes ~ No [] N/A
[] Yes I--1 No [] N/A
[] Yes ~ No I--I N/A
Itl Yes ['"'] No ['--[ N/A
[] Yes [=-] No [] N/A
I-x'l Yes I--I No [] N/A
[] Yes ['"'] No [] N/A
[] Yes [] No [] N/A
1-~ Yes [~ No [--I N/A
IfanyoftheitemsabovearemarkednoorN/A, pleaseexplain: A. No oronosed chan~e~
to Zone 'A' floodplains H. Tie-in w/ LOMA 8/10/92 L. FF21A RMs used
for field surveys, City topo maps used for base maps.
What is the source and date of the updated topographic information (example: orthophoto maps,
July 1985; field survey. May. 1979, beachorofiles, June 1987, et~ )7 Cit}[ aerial topo
maps dated 2-29-92 anO on-site field surveys 5-8~'~ud ~-~2
What is the scale and contour interval of the following workmaps?
a. Effective FIS UNKNOWN scale UNKNOWN Contour interval
b. Revision Request 1"=200' scale 2 ' Contour interval
Attach an annotated FIRM and FBFM at the scale of the effective FIRM and FBFM showing
the revised 100-year and 500-year floodplains and the 100-year floodway boundaries and how
they tie into those shown on the effective FIRM and FBFM downstream and upstream of the
revision.
SEE ATTACHED
Attach additional pages if needed.
October 1992 Page I of 3
July 15, 1993
Federal Emergency Management Agency
1725 'I' Street N.
Washington, D.C. 20472
RE: Case Number 93-06-267R, Request for a Conditional Letter of
Map Revision on Grapevine Springs in Coppell, Texas
Grapevine Springs Park Project
Dear Mr. Magnotti:
Enclosed please find revised FEMA Forms 1, 2, 4 & 5, plus a check
for $ 735.00 to cover the initial review fee as requested in your
letter of July 8, 1993. The technical report (dated 6-3-93) pre-
pared by Graham Associates, Inc. which contains HEC-2 hydraulic
models, floodway and floodplain mapping and construction plans for
this proposed project is un-effected by these revised forms.
As the designated official in charge of administrating the City
of Coppell's floodplains, I do hereby request that FEMA review
this technical report and issue a CLOMR, also, I hereby request
that FEMA revise the floodways, in accordance with this report,
after the project is constructed.
The City of Coppell agrees to maintain and repair, if needed, the
hydraulic improvements proposed by this project as described in
the attached maintenance plan.
The City of Coppell has notified all effected property owners
of the City's intent to revise the floodplain and floodway. A
list of these property owners is attached along with a sample
notification letter. At this point, the City has not received
comments from the effected property owners, however any forth-
coming comments will be forwarded to FEMA.
If you have any technical questions about the project please con-
tact Neal Chisholm of Graham Associates (817-640-8535), however
administrative questions should be directed to Mr. Ken Griffin
at the City of Coppell (214-393-1016). Thank you for your con-
sideration of this request.
Sincerely,
CITY OF COPPELL
Kenneth M. Griffin, P.E.
City Engineer
cc: Jack Quarles, FEMA Region VI
Jack Hedge, P.E., Dallas County
Neal Chisholm, P.E. Graham Assoc.
Rick Wieland, Parks and Rec. Mgr.
July 15, 1993
Maintenance Plan
Grapevine Springs Park Project
City of Coppell, Texas
The purpose of the following maintenance is to provide adequate
hydraulic conveyance in the park project area, especially the
by-pass channel. Additional and more frequent maintenance may
be necessary for park access, aesthetics and/or park usability.
The park shall be visually inspected at least once a year by
City staff personnel familiar with the hydraulic considerations.
Also, the park shall be visually inspected after significant
flood events. Written notes, photographs and/or notations on
maps or drawings will be taken by the inspector and retained by
the City.
The grass, weeds and/or brush in the main channel and in the by-
pass channel will be mowed at least twice a year.
Accumulated sediment will be removed from the main and by-pass
channels and disposed of in non-floodway areas. Sediment removal
will be on an as-needed basis.
Minor amounts of water born debris will be removed twice a year
in conjunction with park mowing. Fallen trees, logs and other
large debris that is obstructing the main or by-pass channels,
(or that may become lodged in the stream channel during a flood
event) shall be removed promptly.
Future repairs to the proposed foot bridges, the proposed con-
crete erosion protection and the existing stone lake walls shall
be performed in a manor consistant with FEMA rules regarding
work in a designated floodway.
Catallus Development Corp.
Suite 600
5429 LBJ Frwy.
Dallas, Tx 75240-2609
Prentiss Copley Inv. Group
Suite 5000
1717 Main St
Dallas, Tx 75201
Soto Amado
606 Meadowiew
Coppell, Tx 75019
Made Nixon
312 Southwestern
Coppell, Tx 75019
Alta Lagrone
6308 Woodstream Ct.
Dallas, Tx 75240
Brenda & Kay Beth Florence Mertz
146 Crescent Dr.
Granbury, Tx 76049-5315
Daniel C. Soto
P.O. Box 151
Coppell, Tx 75019
E.V. Matthews
304 Southwestern Blvd.
Coppell, Tx 75019
July 15, 1993
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Atto: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
E.V. Matthews
304 Southwestern Blvd.
Coppell, Tx 75019
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be ~,~,~ feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. G-riff'm, P.E.
City Engineer
July 15, 1993
Brenda & Kay Beth Florence Mertz
146 Crescent Dr.
Granbury, Tx 76049-5315
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be tY,~t~ feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
Alta Lagrone
6308 Woodstream Ct.
Dallas, Tx 75240
Re.'
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be 6)t c~7, feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
Daniel C. Soto
P.O. Box 151
Coppell, Tx 75019
Re:
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be t9, ~/~ feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
Made Nixon
312 Southwestern
Coppell, Tx 75019
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream' s flooding charaemfisfics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be % 70 feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
SotS Amaao
606 Meadowiew
Coppell, Tx 75019
Re:
Grapevine Springs Park Project
Grapevine Creek, CoppeR, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be ~,,7~) feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer' s Office
city of coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
Prentiss Copley Inv. Group
Suite 5000
1717 Main St
Dallas, Tx 75201
Re:
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a de~_~iled study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain maps. We have estimated this rise to
be ~ · ~ ] feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
July 15, 1993
Catallus Development Corp.
Suite 600
5429 LBJ Frwy.
Dallas, Tx 75240-2609
Grapevine Springs Park Project
Grapevine Creek, Coppell, Texas
Dear Property Owner,
construction will be starting soon on a new park located on Grapevine Creek South of
Bethel Road. Because the proposed project involves construction in the stream channel
itself, a detailed study of the stream's flooding characteristics has been performed. The
proposed work will NOT result in higher flood elevations, as compared to the existing
conditions, outside of the park area. However, the existing condition flood levels are
higher then those shown on the City's floodplain raps. We have estimated this rise to
be '~',O (:> feet on your property. This may or may not be significant to you. The
City is interested in your comments on this matter and invites written comments to be
sent to:
City Engineer's Office
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Attn: Grapevine Springs Park Project
Thank you for your cooperation.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer