COPPELL PUBLIC WORKS
M~4ORANDU~
uut
By: Engineering
May 28~ 1992
Ken Griffin, City Engineer .
Howard Pafford, utilities Superlntendent~
Development Fees for villages at Cottonwood Creek
Section IV
The following fees should be assessed on the above referenced
project.
Water Impact Fee: (Does not include Irrigation)
152 - 5/8" x 3/4" Domestic Meter/s = 152 ESU's
, _ Irrigation Meter/s = ESU's
Fireline Meter/s = ESU's
Total 152 ESU's @ $650.00 ea = $98,800.00
100% due prior to Council approval of final plat.
* There will be water impact fees on the irrigation meters.
Wastewater Impact Fee: {MOD)
152-5/8" x 3/4". Domestic Meter/s = 152 ESU'S @ $225.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
152 Connections @ $100.00 each = ~
100% due prior to issuance of building permit.
Sewer Tap I~spection Fee
152 Connections @ $100.00 each = ~
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
152 Residential Lots at $150.00 each
Units (Multi family) at $75.00 each
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
DEVELFE4.HLP
STREET SIGN ASSESSMENT
for Villaqes at Cottonwood Creek Section IV
The following assessment is being made in accordance with the City
of Coppell Subdivision ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNI___~TPRICE ~
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 31
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60 1
Stop & Street Combo $ 96.85 11
OTHER
No Outlet $ 11.60 6
11.60
1,065.35.
$ 69.60
TOTAL
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 5/28/92