Loading...
Villages of CC P4-PT 930406Representing: ~, .~/]]. ~ Date: Permit Issued To: Name: Address: t' ,' ' ¥ I ' ~rave ~1i City and/or Franchise Utilities .Be~n ~on~ac~ed and Existinq Utilities Located. /~ ~YES NO will It Be Necessary to Excavate Street, A~ley or Sidewalk / Pavement? YES (attach permit) ~/ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by. the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depax~_men~s prior to closing (462-1144, 462-1133 and 462-8495). A~=ach Work Order (Franchise 0nly) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. ranchise/C~ntrac{or Representative Franchise Inspector/or City Inspector Date Applicant shall indemnify and forever hold harmless against each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blockinq, excavating, cutting, ~unneling, or other work by the applicant under permit from the City, if such permi~ is granted. PERMIT. PHB All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to beck fill operation taking place. Staff will be sent to inspect the project. · ' [~ Side C/L [~ Outside C/L [] R/W LONE STAR GAS COMPANY ~roposed }, Proiect Sketch of { Completed LOCATION ~ TOWN PLANT_ SCHOOL DIST,_ MAP SHEET NO.{s)__ /-"~_~ f', r' .... "~.-'- .- .r',f ,~, I (,?,l+~.~..I lll~-~.Y HAy.chi' .~4. · . DISTRIIIUTION PLANT~ RETURNED TO WAREHOUSE EW INSTALLATION Original ER No. or Date of Installation tot replacement et lrement projects Only: Date of this report ._ /'/-/.~ ' [:3 R/W LOCATION city or tOWn TOWN PLANT (if other then location) SCHOOL DIST. (Dallas & Tarrant Counties) LONE STAR GAS COMPANY Pro'posed t Sketch of { Completed I Project Co. No.: /¢~, Region:~_.~ ER/RR NO. ~'-~/~ /~ MAP SHEET NO.{s} ./','~' ,c~--~ /~' SUMMARY OF PIPELINE CHANGES IN DISTRIBUTION PLANTS ABANDONED RETURNED TO WAREHOUSE NEW INSTALLATION Size ,~Kind Feet Size Kind Feet Size Kind Feet /~., ~./;~ Original ER No. or Date of Installation for replacement end retirement projects only: Date of this report