Loading...
DR9305-CN 930513DALLAS COUNTY PUBLIC WORKS Hay 13, 1993 Mr. Carroll L. Lilly, P.E., Vice President Graham Associates, Incorporated First Republic Bank, Suite 201 705 West Avenue B Garland, Texas 75040 Attention= Mr. Jeff Williams, P.E. Re ~ Grapevine Sp=lngs Park Open Space Project $482-485 Hydraulic Study, FEMA Report Dear Mr. Lilly= Enclosed is a signed original of the contract with your firm for preparation of an application for a FEMApermit to perform the erosion control work on Grapevine Creek in the Grapevine Springs Park. The application must be in a form acceptable to FEMA and the City of Coppell and its Flood Plain Administrator. Your proposal contained a requirement to meet with Dallas County and City of Coppell staff to establish parameters of the study. We propose to hold this meeting at 9 A.M. on Tuesday, May 18, 1993 at Dallas County Public Works Department Conference Room, 411 Elm Street, Fourth Floor. Since our contract provides for a not-to-exceed cost of $1,500.00 we understand that you will invoice the City of Coppell directly for one-half of the final cost, estimated at $3,000.00. Please consider this your authorization to proceed with the work in accordance with the enclosed contract. Sincerely, ~e~ Bud Beene, · . Director of Public Works Enclosure (1): Mr. Ken Griffin, P.E., City Engineer, City of Coppell Mr. Rick Loessberg, Planning/Development Coordinator OI~NEI~ACE:~(31~'VNCR~.LTK 411 Elm Street Dallas, Texas 75202 653-7151 93 78 - OR~ER NO. , _ DATE MAY 1 1 STATE OF TEXAS COUNTY OF DALLAS COUNTY AUDITOR FUNDS AVAILABLE BE IT REMEMBERED, at a regular meeting of th~ Co_mmiseioner~ Court of Dallas county,-Texas, held on the 11th day of May on motion made by Nancy E. Judy, Cc~missioner of District No. 2 and seconded by Chris V. S~os~ C~ssioner of District No. 4 1993, the following order was adopted: WHEREAS, WHEREAS, WHEREAS, NHEREAS, WHEREAS, it has been determined that in order for a permit to be issued for proposed channel erosion protection work on the Open Space Project at Grapevine Springs, a hydraulic study performed by Graham Associates, Incorporated in 1992 must be submitted in a form acceptable to the Federal Emergency Management Agency (FEMA} I and Graham Associates, Incorporated has agreed to perform said work within a two week period for an additional $3,000 of which the City of Coppell will pay $1,500 to the firm directlyl and by fund£ng $1,500, Dallas County will allow the process to move forward toward receipt of bids for the work to be contracted~ and the Director of Public Works concurs with the above and recommends that said contract be executed as stipulated for a total cost to Dallas County not to exceed $1,$00~ and said contract was discussed in briefing on May 4, 1993. IT IS THEREFORE ORDERED, ADJUDGED AND DECREED b~. th? ~all~s_.Cou~t~ Commissioners Court that the County Judge is hereby a~=norlzea aha altec=es to ~xecute the attached contract with Graham Assoc~ate~, Inc., for said project for an amount not to exceed $1,500.00 to be paid from Fund 482, Department 485. DONE IN OPEN COURT, this the 11th day of May , 1993. DALLAS COUNTY DEPARTMENT OF PUBLIC WORKS ENGINEERING CONTRACT THIS AGREEMENT, made, entered into, and executed this llth day of ~'~Y ., 19 93 ., by and between the County of Dallas, Texas acting herein by and through its County Judge, duly authorized so to act on ~ay 11 , 19 93 .., by Court Order No. 93-781 (hereinafter referred to as "the County"), and Graham Associates, Inc. _, a Texas Corporation (hereinafter referred to as "the Engineer"). WITNESSETH: WHEREAS, the County desires a hydraulic study in connection with the Grapevine Springs Open Space Project; and WHEREAS, the Engineer is acceptable to the County and is willing to enter into a contract with the County to perform said services in connection with said project on Grapevine Springs at its location over n/a or within its limits from n/a to n/a ; and WHEREAS, this Contract shall be administered on behalf of the County by its Director of Public Works (hereinafter referred to as "Director"), and the Engineer shall fully comply with any and all instructions from said Director. The decision of the Commissioners Court in all disputes shall be final and binding. NOW THEREFORE, IT IS AGREED AS FOLLOWS: I. The County hereby retains the Engineer in the scope of the project as described in Attachment "A# attached hereto and made a part hereof. 1. The Engineer shall provide three copies of the reports, test reports, plats, property descriptions, etc., as outlined in Attach- ment "A#. 2. The engineering report is to be completed within 2 calendar weeks from date of written authorization to proceed bythe County. II. FEE~ The fee for the total scope of services outlined in Attachment "A", and as agreed to by the Engineer and the County shall not exceed One Thousand FiVe ~undred and no/hundredths ($1,500.00) DOLLARS. The County shall pay the Engineer for actual work completed based on the unit prices established in Attachment "A" upon acceptance by the County of the completed work. III. It is understood and agreed that the County shall have complete control of the services to be rendered, and that no work shall be done under this Contract until the Engineer is instructed in writing to proceed with the work. IV. Any provision in the contract notwithstanding, it is specifically understood and agreed that the Engineer shall not authorize or undertake any work pursuant to this contract, which work would require the payment of any fee, expense or reimbursement in addition to the fee stipulated in Article II of this Contract, without having first obtained specific written authority therefor without having first obtained specific written authority therefor from the County. V. This Contract shall not be assignable in whole or part without written consent of the County. VI. Upon completion of said services and submittal of reports to the County, the Engineer may apply for applicable amounts due and payable. Ail payments for services rendered by the Engineer and accepted for approval by the County that have not been paid within ninety (90) days after becoming due, shall thereafter accrue interest at a rate of seven percent (7%) annum. VII. In connection with all work outlined or contemplated above, it is agreed that the County or the Engineer may cancel or terminate this contract upon thirty (30) days written notice to the other, with the provision and understanding that immediately upon receipt of notice of such cancellation from either party to the other, all work and labor being performed under this contract shall immedi- ately cease, pending final determination at the end of such thirty-day period, and further provided that the Engineer shall be compensated in accordance with the terms of this Agreement for all work accomplished by them prior to the receipt of notice of such termination. VIII. The Engineer agrees to indemnify and save harmless the County from any liability or damages County may suffer as a result of claims, demands, costs, or judgements against County arising from any act, omission, neglect or misconduct in the performance of the work and services under this agreement, except for any liability or damages caused by the negligence of the County, its officers and/or employees. IN WITNESS WHEREOF, the County of Dallas, Texas, has caused these presents to be executed by the County Judge as pertaining to Attachment "A" for the fee of not to exceed One ThoUsand Five Hundred and no/hundredths (~_~) DOLLARS; and the Engineer has caused these presents to be executed by a duly authorized representative on the day and year set forth above. COUNTY OF DALLAS, TEXAS Graham Associates, Inc. Engineer B~W. J~W~li~ms, Vice President "ATTACHI~ENT CONSULTING ENGINEERS & PLANNERS April 8, 1993 Mr. Allen Bud Beene, P.E. Director of Public Works Dallas County 411 Elm Street, 5th Floor Dallas, Texas 75202 Re: Park Project in Coppell, Texas Dear Mr. Beene: Per your request, this letter will serve as Graham Associates proposal to provide the civil engineering services required for the preparation of a F.E.M.A. report for the above referenced project. We propose the following scope of services: Ae Meet with Dallas County and City of Coppell staff to establish parameters of the project. Be Prepare a report suitable for submittal to F.E.M.A. including hydraulic models and exhibits. Submit the report to Dallas County and the City of Coppell for review and approval. D. Furnish sufficient copies for submittal to F.E.M.A. Compensation to Graham Assog'iates for the work oudined above will be on an hourly basis at our e,s,tablished hourly rates, copy attac..l~d. .The total fee will not exceed Centerpoint Two Suite 4(X)/616 Six Rags Drive Arlington, Texas 76011 Metro (817) 640-8535 FAX (817) &33-5240 Summit Office Park 1300 Summit Ave. #712 FL Worlh, Texas 76102 (e17) 332-575e FAX (817) 336-6909 NationsBank Suite 201/705 W. Ave. B Garland, Texa~ 75040 (214) 272-4855 FAX (214) 272-4655 "ATTACI~T A" Billings will be on a monthly basis. Payment is due on the lOth of the month following the billing date. Thank you for this opportunity to assist Dallas County in this matter. If this proposal is acceptable, please sign and return one copy for our files. Sincerely, GRAHAM ASSOCIATES, INC. Carroll L. Lilly, P.E. Vice President APPROVED: Dallas County GRAHAM ASSOCIATES, INC. ESTABLISHED HOURLY RATES FEBRUARY, 1990 SENIOR ENGINEER REGISTERED ENGINEER GRADUATE ENGINEER TECHNICIAN III TECHNICIAN II TECHNICIAN I DR.A~'TSMAN 4 MAN FIELD SURVEY 3 MAN FIELD SURVEY 2 MAN FIELD SURVEY CADD STATION DIGITAL PLOTTER REMOTE TERMINAL (CPU Time) CLERICAL 75.00 65.00 55.0O 50.0O 40.O0 3O.O0 25.00 85.OO 75.00 65.OO 25.00 1.00/Min. 20.O0 15.00