Loading...
Freeport NIP(7.7)-CS 960703The City With A Beautiful Future. P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 3, 1996 Mr. Jim McElroy Emerson Parmers, Inc. 4516 Lovers Lane, Suite 197 Dallas, Texas 75225 PUBLIC WORKS RE: Final Acceptance Creekview Dr. Dear Mr. McElroy: A final inspection of paving and utilities for the referenced project has been confn'med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector CC: Kenneth M. Griff'm, P.E., City Engineer Matt Cast, Superintendent of Public Services Greg Jones, Chief Building Official Jeff Jones, Fire Marshal Doug Stevens, Engineering Technician Jimmy Whatley, Austin Bridge & Road Jimmy Henderson, Legend Construction Andre Taylor, Rust Lichliter/Jameson file/ldavis/0finalac.ltr