Loading...
Northlake WE P1-6-CS040115COPPELL January 15, 2004 Jemy Daniels 4D Construction 11200 Old Seagoville Rd Balch Springs TX 75180 Drainage Improvements at 775 Pelican Ln Final Acceptance Dear Mr. Daniels: Representatives of the City of Coppell have confirmed a final inspection of the referenced project. The two-year maintenance bond and as-built drawings have been received fi.om the contractor. Maturity on the bond will be two years from the date of this letter. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CCi Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary ~Glenn Hollowell, Director of Public Works Donald Brewer, 775 Pelican Ln, Coppell TX