DR9305-CS 930129P.O. Box 478 Coppell, Texas 75019 214-462-0022 January 29, 1993 Mr. Neal Chisholm, P.E. Graham Associates, Inc. Centerpoint Two 616 Six Flags Dr., #400 Arlington, TX 76011 Re: Proposed Grapevine Springs Park/Dallas County - Erosion Control Project Dear Mr. Chisholm: I have reviewed the HEC-2 models and drawings you submitted in support of the above-referenced proposed erosion control measures for the Grapevine Springs Park (the Park). You have provided a split flow analysis for a portion of Grapevine Creek crossing the Park from Section 4.5 through Section 6.0 using 10 year and 100 year FEMA discharges. As a result of this project, the referenced section of Grapevine Creek has more data resulting from surveyed crpss-sections, both along the main stream and the by-pass channel. The proposed erosion control measures are mainly along the by-pass channel, for restoration of the Park. The existing and proposed 100-ye,~u' floodplain lines and floodway must be delineated on the ~rol~osed~ Please address this comment in your final submittal. Based on my review, and our discussions through the review process, we have no objections to your proposed Plan. Please provide two (2) sets of the flood study report along with necessary plans and the FEM'~, ~ertification form for LOMR in support of the proposed Park reclamation project. I will then forward a transmittal letter along with a copy of your flood study report to FEMA, with our recommendation of approval. Please note that according to the attached memorandum from Dallas County dated November 20, 1992, Graham Associates, Inc. is to follow up with the Corps of Engineers for wet land determination and issuance of the 404 permit, if applicable. If you have any questions, please call me at (214) 393-1016. xc: Ken Griffin, P.E., City Engineer Rick Wieland, Parks & Recreation Manager v-~J~k Hedge, Dallas County Jeff Williams, Graham & Associates - -*. .~:17.--::;n.. . ~-;'~' " -/ l -- / i-" .------/ I '---'" ~ ~ =7 ,_~ The C,ty \Nltn --- ---.----. .....- r:--~ ~f--= .j;~! =;~/ .-.. '..-.-. ,I A Beautiful Future PO Box 478 Cappell. Texas 75019 214-462-0022 8 1___________~ f r-- ~_-_} r-n~j January 29, 1993 Mr. Neal Chisholm, P .E. Graham Associates, Inc. Centerpoint Two 616 Six Flags Dr., #400 Arlington, TX 76011 Re: Proposed Grapevine Springs Park/Dallas County - Erosion Control Project Dear Mr. Chisholm: I have reviewed the HEC-2 models and drawings you submitted in support of the above-referenced proposed erosion control measures for the Grapevine Springs Park (the Park). You have provided a split flow analysis for a portion of Grapevine Creek crossing the Park from Section 4.5 through Section 6.0 using 10 year and 100 year FEMA discharges. As a result of this project, the referenced section of Grapevine Creek has more data resulting from surveyed cross-sections, both along the main stream and the by-pass channel. The proposed erosion control measures are mainly along the by-pass channel, for restoration of the Park. The existing and proposed l00-year floodplain lines and floodway must be delineated on the proposed grading plans. Please address this comment in your final submittal. Based on my review, and our discussions through the review process, we have no objections to your proposed plan. Please provide two (2) sets of the flood study report along with necessary plans and the FEMA certification form for LOMR in support of the proposed Park reclamation project. I will then forward a transmittal letter along with a copy of your flood study report to FEMA, with our recommendation of approval. Please note that according to the attached memorandum from Dallas County dated November 20, 1992, Graham Associates, Inc. is to follow up with the Corps of Engineers for wet land determination and issuance of the 404 permit, if applicable. If you have any questions, please call me at (214) 393-1016. Sincerely, xc: Ken Griffm, P.E., City Engineer Rick Wieland, Parks & Recreation Manager Jack Hedge, Dallas County Jeff Williams, Graham & Associates - 'l J ~ <S. "Gi::~ \ \ ' '; ~ \. .1 DALLAS COUNTY PUBLIC WORKS \ -_ :~vC ',.- November 20, 1992 MEMORANDUM TO: Rick Loessberg, Planning/Development Coordinator FROM: Jack D. Hedge, Manager, Civil Design Section THROUGH: T. R. Kennedy, P.E., Assistant Director, Engineering & Constructio THROUGH: Allen Bud Beene, P.E., Director of Public works_ RE: Meeting on 18 November 1992; 2:30 p.m. Grapevine Springs Open Space (Project 490-485) 1. In attendance: Rick Loessberg, Planning/Development Coordinator Jeff Williams, P.E., Graham & Associates Ken Griffin, P.E., City Engineer, City of Coppell Mike Sharp, Superintendent, Road & Bridge District No. 4 Jack D. Hedge, P.E., Manager, Civil Design Section, Public Works 2. Listed below are the main points covered and agreements reached at the captioned meeting: a. Jeff Williams stated that the final report would state that the proposed work would result in a 0.01 foot increase in 100 year flood elevation at the first foot bridge and a 0.01 foot decrease at the confluence of the main and bypass channels. This increase at the bridge is totally contained within Dallas County property (the park). b. Given a. (above), Ken Griffin indicated that probably the City of Coppell and FEMA would agree to the proposed work. c. Both Coppell and FEMA will require that any excess excavation be removed from the site instead of using it to raise the elevation of the island. 411 Elm Street Dallas, Texas 75202 653-7151 - Rick Loessberg November 20, 1992 Page Two d. Graham's final report will contain horizontal and vertical geometries and estimated cut and fill volumes. e. Dallas County Public Works Department will stake alignments and backslope/frontslope points to insure that construction matches the proposal. f. Graham will give final report to City of Coppell (with Copy to Dallas Count,,). City will submit letter of support to FEMA with request for approval of proposed work. g. Graham will proceed to completion of the report and will prepare the "Section 404" letter to the Corps of Engineers. 3. Please call if you have questions, corrections or additions. I r ../ L// ~i;,!,,~ Jack D. Hedge, P.E. LManager, Civil Design Section JDH:rem cc: Mike Sharp, Superintendent, Road & Bridge District No. 1 .Jeff Williams, P.E., Graham and Associates v'.1<en Griffin, P.E., City Engineer, City of Coppell fil.:4fmiseI4: a:Grpvnmtll.ntl