Loading...
Wynnpage Plaza-CS020905 (2)MEMORANDUM FROM THE~ DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Rick O'Dell, Comtmctipn Inspector Engineering Larry Morton, Streets Division Public Works 9/5/02 Walk-thru W~/nnpage pl~,~ South Stain ADA ramps brick red. Rout and seal random cracks. Remove redwood & seal at valve stack in approach. CITY OF COPpELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON IDzCITY OF COPPELL DATE 09/05 S~R-TIME DISTANT STATION ID MODE PAGES 00'26" 9?2 304 9041 CALLING 01 RESULT OK 0000 08×29×2002 15:26 CITY OF COPPELL ENGR, DEPT. a SRU CTR N0~947 QO~ CO?PELL August 29, 2002 James Bratton Stiding Waiascott, ~nc. 167'/5 Addison Rd Suite 360 D~as, TX 75248 fax 972-447-9110 RE: Wynnpago Plaza SouLh Final Walk-thru Dear James: Please be advised that a walk-through has been scheduled for Wednesday, September 4~ at 9:00 a.m. for the water, sanitary sewer, paving and drailtage facilities ha the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is g~eatly appreciated. If you should have any questions, please call 972-304--7090 at your earliest convenience. /,~ely, _x ~0 ~ Rick O'Dell Consu-uction Inspector Offi~ Phone: (972) 304-7090 Fax: (972) 3~-3570 Kea Griffin, Director of Engineering & Public Works Glenn Hollowell, Director of Public Works Oreg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Travis trump, Fire Marshal