Riverchase (6.1)-CS 960408The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
April 8, 1996
Fei[mi Karahan
Riv~chase Plaza Limited
550 lkLBJ Freeway
Suite 9x05
Dallas, X~exas 75240
RE.'. Riv?chase Phase ~ lot_~!OX_~R~
Development Fee Assessment
Dear Mr. Karahan:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for the Rivereha~e Phase II Lot B-R Addition.
Please make payment to the City of Coppell in the amount of $9,450.00 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
ccl
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Ted Dutt, Interim Utilities Superintendent
Barbara Coleman, Street Division
Rick Wieland, Parks Development Coordinator
CITY OF COPPELL
DEYELOPM1ZNT FEES
Date:
Project:
April 8, 1996
Riverchase Phase H lot B-R
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 5,850.00 5,850.00
(100% due prior to Council Approval)
Water Tap Inapection Fee 100.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 3,600.00 3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 30.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 134.93
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00
000% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
000% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow 0
000% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $ 9,860.98 $9,450.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until al%r TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be szseaeed.
COPPELL ENGINEERING
~EHORANDUM
DATE:
TO:
FROM:
RE:
March 2, 1996
Mike Martin, Assistant City Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for RIVERCHASE PHASE II LOTB-R
The following fees should be assessed
referenced project.
Water Impact Fee:
1 ~, Domestic Meter/s = 8 ESU's
1 - I ~ Irrigation Meter/s = 5 ESU's
Fireline Meter/s =__ESU's
Total 13
and collected on the above
ESU's ~ $450.00 ea = S5.850.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 2" Domestic Meter/s = 8 ESU's
Total 8 ESU's ~ $450.00 ea = $3,600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $50.00 each = $100.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections ~ $50.00 each = $
100% due prior to issuance of building permit.
(RE-INSPECTIONS for Water or Wastewater $30.00)
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots ~ $ 50.00/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 2" Domestic Meters @ $195.98 = $195.98
100% due prior to issuance of buildin~ permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1 ~ Irrigation Meter/s ~ $134.93 ea
- Fireline Meter/s ~ $
Total
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-F~m~ly or Non-Residential)
1 Meters ~ $30.00 ea = $30.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
1 Meters ~ $35.00 ea = $35.00
lOO% due prior to issuance of water meters.
ea
$134.93
= $134.93
= $
ESCROW ~ .~OADWAY IMPACT FEE CAL,~ULATIONS
PROJECT:
DATE:
Riverchase Plaza Phase II
4/9/96
STREET ESCROW:
Street Name(s) MacArthur Blvd.
Street Type P4D/6
Cost per Foot $0.00
Length of Adjacent Frontage (Linear Feet) 381.19
Escrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $0.00
ROADWAY IMPACT FEE:
~ervice Area * 7
Category ** Commercial
Land Use **
Buildin~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Shoppin[~ Center
14,237
14.237
4.77
Fee per Vehicle Mile $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $20,373.15
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.