Loading...
Riverchase (6.1)-CS 960408The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 8, 1996 Fei[mi Karahan Riv~chase Plaza Limited 550 lkLBJ Freeway Suite 9x05 Dallas, X~exas 75240 RE.'. Riv?chase Phase ~ lot_~!OX_~R~ Development Fee Assessment Dear Mr. Karahan: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Rivereha~e Phase II Lot B-R Addition. Please make payment to the City of Coppell in the amount of $9,450.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer ccl Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Barbara Coleman, Street Division Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEYELOPM1ZNT FEES Date: Project: April 8, 1996 Riverchase Phase H lot B-R TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 5,850.00 5,850.00 (100% due prior to Council Approval) Water Tap Inapection Fee 100.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 30.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 134.93 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 000% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not 000% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow 0 000% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 9,860.98 $9,450.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until al%r TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be szseaeed. COPPELL ENGINEERING ~EHORANDUM DATE: TO: FROM: RE: March 2, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for RIVERCHASE PHASE II LOTB-R The following fees should be assessed referenced project. Water Impact Fee: 1 ~, Domestic Meter/s = 8 ESU's 1 - I ~ Irrigation Meter/s = 5 ESU's Fireline Meter/s =__ESU's Total 13 and collected on the above ESU's ~ $450.00 ea = S5.850.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's ~ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $50.00 each = $100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections ~ $50.00 each = $ 100% due prior to issuance of building permit. (RE-INSPECTIONS for Water or Wastewater $30.00) (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ $ 50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 2" Domestic Meters @ $195.98 = $195.98 100% due prior to issuance of buildin~ permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 ~ Irrigation Meter/s ~ $134.93 ea - Fireline Meter/s ~ $ Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-F~m~ly or Non-Residential) 1 Meters ~ $30.00 ea = $30.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $35.00 lOO% due prior to issuance of water meters. ea $134.93 = $134.93 = $ ESCROW ~ .~OADWAY IMPACT FEE CAL,~ULATIONS PROJECT: DATE: Riverchase Plaza Phase II 4/9/96 STREET ESCROW: Street Name(s) MacArthur Blvd. Street Type P4D/6 Cost per Foot $0.00 Length of Adjacent Frontage (Linear Feet) 381.19 Escrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $0.00 ROADWAY IMPACT FEE: ~ervice Area * 7 Category ** Commercial Land Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Shoppin[~ Center 14,237 14.237 4.77 Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $20,373.15 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.