Loading...
Wynnpage Plaza-CS020109CiTY Or 9PPELL ENGR, DEPT. + SRU CTR T H E · G I T Y 0 F N0.420 J~nuary g, 2002 M~rc Bentley, P.E. Bentley Engineering, Inc. 702 Oa[ewood Drive Garland, Texas 75043 Wynnpage Plaza Loll Block A (r~vised) Fee Assessment Letter Dear Mr. Bentley: Enclosed is a copy of the Civ/of Copp~ll Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. This is r~vised from the prior tee schedule to include the fireline me[er. This was inadvertently omi~ed from ~he prior schedule. Thc total amount to be paid has increased from $9,590.25 to $11,563.98. This is a difference of $1,973.73. Please note that thc Texas Legislature, under Senate Bill 243, delayed ~he collection of Water and Sewer impact Fees until the issuance ora Building Permit. The additional fees for water and sewer taps, water me[ers, and utility inspection fees need to be paid by sep~ate check at the Public Works Service Center, 732 Deforest Road. Me,ers will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working wkh you on this project. If you have any questions, please feel flee to contact mc at your convenience. Director of Engineering/Public Works CC: Jennifer Armstrong, Fimmce Director l~onda Brothers, Engin~ring Secretory Glenn Holloweli, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEES PROJECT NAME: Wynnpage Plaza, Lot 1, Block A ENGINEER: OR G NAT ON £ 10/26/01 1/9/02 (revised) SENT ASSESSMENT ASSESSED FEE ~,MOUNT PAID DATE Park Fee Water Impact Fee (revised) 2/20/02 Wastewater Impact Fee (revised 2/20/02 Street Sign Street Light notify street dept. 12/26/01 Construction Inspection $2,721.81 $2,721,81 rb 12/26/01 10/26/01 Roadway Impact-Zone $5,625.90 $5,625.90 rb 12/21/01 Street Cut Permit Overtime Inspection Water Tap Inspection $150,00 $50.00 dki 3/5/02 Wastewater Tap Inspection $50.00 $50.00 bh 2/20/02 Water Meter (Domestic) $142.10 Water Meter (Fire/Irrig) $1,255.98 $1,193.73 dki 3/5/02 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $60.00 $30.00 dki Utility Final Inspection $50.00 $50,00 bh Total Fees Fees Paid TOTALS $14,235.79 $13,871.44 $2,800.00 $2,800.00 bh $1,400.00 $1,400.00 bh 3/5/02 2/20/02 Amount Owed $364.35 NOTES Prior To Construction Erosion Control Approved E.P.A. NO.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maid. DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NATION D/ 10/26/01 1/9/02 (revised) SENT ASSESSMENT ASSESSED FEE ~,MOUNT PAID DATE Wynnpage Plaza, Lot 1, Block A 12/26/01 10/26/01 Park Fee Water Impact Fee (revised) Wastewater Impact Fee (revised Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $2,800.00 $2,800,00 bh $1,400.00 $1,400,00 bh 2/20/02 2/20/02 $2,721.81 $2,721,81 rb 12/26/01 $5,625,90 $5,625.90 rb 12/21/01 $150.00'~ $50,00 dki $50,00 $50.00 bh $142.10 ~ $1,255.98~ $1,193.73 dki $30.0011~ $60.00"~ $30.00 dki $50.00 $50.00 bh TotalFees Fees Paid $14,235,79 $13,871.44 3/5/02 2/2O/02 3/5/02 3/5/02 {42.1o 2/20/02 Amount Owed $364.35 ~ Prior To Construction Erosion Control Approved E.P.A -N.O.I. Recd, Const. Plan Approved NOTES MESSAGE CONF I RMAT I ON 06/21×02 15: 23 ID--CITY OF COPPELL DATE 06/21 S~R-TIME DISTANT STATION ID 00~48" 214 44? 9110 MODE PAGES RESULT CALLING 01 OK 0000