Loading...
Wynnpage Plaza-WO020805Phone Number Check For: Accuracy Test WATER ~ ..... .~ Employee: //~-~. _ ~-~ C_n'id,Ma~p: Meter Leak Initial Meter Relocation Inspections Check Water Pressure Backflow Imp. Bkflow Cert. Date Re-Cert. Date Re-Read 2. Reoair 3. Maintenance 4. Other A. Main Line A. Pump A. Line Locate B. Valves B. Water Tower B. Line Locate C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electxolysis B. New Cons~xuction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B, Cones C. Tape D. Lights E. Other Q STFORSER' CES: / / 7. If Meter / Set, ce Leak, ClassiC': City A.. Water Loss (estimate): GPM B. Was Water Metered: C. Was Customer Notified: If Meter Change Out: A. Old Meter # B. New Meter # C, Old Meter S~ze / Type E. Type of work performed or f'mdings: Fire Plug Flushing YES NO VERBALLY Customer Total Gallons DOORKNOCKER Reading Reading New Meter Size / Type 9. If mainline or deep ser~'ice repak, describe type of pipe or service line afl'condition: 10. Man hours: 11. List materials used: Crew members: [2. [£you had an acc~denrAncident '~,'hile performing this request, did you report it? 13. Water Utilities,meter inspection: PASS or FAIL 14. How many trips to do task? YES Signature ~e NO