Loading...
Wynnpage Plaza-CS021217 (4) MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Rick O'Dell, Construction Inspector Engineering Marshall Crow, Utilities Division December 17, 2002 Follow-up Walk-thru Wynnpage Phase II Paperwork on DC in vault, domestic, 2" DC & irrigation & letter from landscaper need to come directly to Rick O'Dell. Landscapers need to take care of drainage around top of vault. Call Danny Hightower at 972-462-5150 to check punch list. CITY OF COPPELL PUBLIC WORKS DEPARTMENT HP OfficeJe( ~ ~ries GSSxi Personal Printer/Fax/Copier/Scanner Fax-History Report for Date Time T..vpe ~ Dec20 ll:35am Sent 7041 Duration P_ag~ Result 0:24 1 OK Result: OK - black and white fax Okay color - color fax Dec 20 2002 ll:35am MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To-' From: Date: RE: Rick O'Dell, Construction Inspector Engineering Danny Hightower, Utilities Division December 17, 2002 Walk-thru Wynnpage Phase H 1. Paint sewer cleanout lid red. 2. Reset sewer cleanout so plug will come out. 3. Need 18" X 18" pad on valve to vault. 4. Vault needs drainage around top of vault. 5. Need paperwork on DC in vault, domestic & 2" DC and irrigation. 6. Blocking under valves in vault. 7. Brass plugs in vault (small-4). 8. Curb stop cut off on 2" meters cut to ground high and capped. 9. Brass plugs in dom. & irr. DC. 10. Letter from landscaper stating they will not cover meters, valves, or manholes, and they will have drainage around vault. 11. Need cleanout cover on sanitary sewer west side. Call Danny Hightower at 972-462-5150 to check punch list. CITY OF COPPELL PUBLIC WORKS DEPARTMENT I~P Office Jet G Series G85xi Personal Printer/Fax/Copier/Scanner Fax-History Report for Date Time Tvoe Identification Dec 17 12:28pm Sent 7041 Duration P_ag~ Result 0:26 1 OK Result: OK - black and white fax Okay color - color fax Dee 17 2002 12:28pm MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To.' From: Date: RE: Rick O'Dell, Construction Inspector Engineering Larry Morton, Streets Division Public Works 12/17/02 Walk-thru Wynnpage Phase II Paving 1. Stain ADA ramp. 2. Clear concrete spill in gutter. Drainage 1. O.K. CITY OF COPPELL PUBLIC WORKS DEP~4RTMENT HP Office Jet G Series G8$xi Fax-History Report for Personal Printer/Fax/Copier/Scanner Dee 18 2002 8:20am Date Time T._vpe ~ Dec 18 8:lSam Sent 7041 Duration P. ag~ Result 0:21 1 OK Result: OK - black and white fax Okay color - color fax From: To: Date: Subject: Rhonda Brothers walkthru group 12/12/02 10:30AM Walk-thr~J for Wynnpage Plaza II Per Rick O'Dell - please be advised that a walk-through has been scheduled for Tuesday, December 17, 2002 at 10:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Rhonda Brothers Engineering Dept. Secretary