Loading...
Wynnpage-CS 911008(~ ~ The City With A Beautiful Future Mr. Oim Siepiela / V Siepiela Interests, Inc. / We are enclosing a copy of the development fee assessment list this project, dated September 25, 1991. P.O. Box 478 Coppell, Texas 75019 214-462-0022 OCT 10 1991 PUBL!,., WORKS related to Please provide a check in the amount of $110,181.28 made payable to the City of Coppell end forward it, along with a copy of the attached development fee list, to the attention of Mr. Alan Johnson, Assistant Finance Director. These fees must be paid on or before October 23, 1991. Please provide our office with a copy of your paid receipt. In addition, please provide our office with an itemized tabulation of the construction cost for this project for verification of the construction inspection fee. The construction inspection fee may be based on either the actual contract amount or on the engineer's estimate, with necessary adjustments in the fee being calculated at final acceptance of this project. If you have any questions, please contact Ben dele Cruz or me at (214) 393-1016. We appreciate your timely attention to this matter and look forward to working with you On this project. M. Shohre D~nestmrand,-'-F.~. Acting City Engineer MSD/GCH/bd cc: Gary L. Sieb Frank Trando Alan Johnson Kevin Kendrick, P.E., Unzicker, Schnurbusch Associates cc: Taryon Bowman Larry Davis Steve Gorem CITY OF COPPELL DEVELOPMENT FEES Date: September 25, 1991 Project: Wynnpage PAYABLE BY TOTAL FEES 10/23/91 Park Fee Assessment (78 lots X $150 Per Lot) (50% due at final plat approval) (50% due prior to bldg. permits issuance 11,700 $ 5,850 Water Impact Fee (100% due prior to Council approval of final plat) $ 56,760 $ 56,760 Water Tap Inspection Fee (100% due prior to issuance of building permit) $ 7,800 Wastewater Impact Fee (100% due prior to Council approval of final plat) $ 32,916 $ 32,916 Sewer Tap Inspection Fee (100% due prior to issuance of building permit) $ 7,800 Street Sign Assessment (see attached) $ 1,997.57 $ 1,997.57 Street Light Assessment ($292.60 X 13 poles) (see attached) Street Cut Permit $ 100.00 $ 100.00 + (2% of Construction cost) in the amount of $627,885.35 provided by Unzicker, Schnurbusch Associates $ 12,557.71 $ 12,557.71 TOTAL AMOUNT DUE: PRIOR TO 10/23/91 $ 131,631.28 $110,181.28 $110,181.28 **NOTE: STREET LIGHT ASSESSMENT WILL BE CALCULATED BASED ON T.U. ELECTRIC'S LAYOUT PLAN. THIS PLAN ]{AS YET TO BE RECEIVED. KENDATT