Loading...
Wynnpage-CS 911004 (2)SHIMEK, JACOBS & FINKLEA ' 8333 Douglas Avenue, #820 Dallas, Texas 7~2~'~, (214) 3~ ROSS L. JACOBS, I. C. FINKLEA, RE. JAMES E. LAUGHLIN, October 4, 1991 RONALD V. CON~Y, RE. JOHN W. BIRKHOFR EE. MATT ARMSTRONG, RE. JOE R. CARTER, RE. GARY C. HENDRICKS, RE. C. L. SHIMEK, RE. /' Ms. Shohre/aneshmand, P.E. Engineer i~g Department / City of ~oppell / Post Office Box 478 / cion P1 · ans Dear Ms. Daneshmand: We have reviewed the revised construction plans for the Wynnpage Estates to the City of Coppell prepared by Unzicker, Schnurbusch & Associates, Inc. In general, most of our previous comments were addressed. However, the following items should be corrected or addressed prior to final approval of this project: 1. Final plans should be sealed, signed and dated by the design engineer. 2. Sheet 4 of 28, Note 20: It does not appear that Wynnpage Estates is within the Coppell Municipal utility District No. 1, therefore, this note does not apply. 3. Sheet 5 of 28: Sanitary Sewer Embedment shall be as per City of Coppell Standard Detail Sheet SD-20, Type "4" Embedment. 4. Sheet 6 of 28: An additional storm sewer outfall detail has been added to this sheet as requested. Sheet 14 of 28: a) The plans do not include a median pavestone detail. We have provided the design engineer with a detail to be included on this sheet. (See attachment). b) Denton Tap Road Pavement Detail: No. 6 Bars are to be dowelled into the existing pavement on 24-inch centers. Ms. Shohre Daneshmand, P.E. City of Coppell October 4, 1991 Page No. 2 Sheet 20 of 28: T~pe "B-l" embedment shown is not acceptable for sanitary sewer embedment. Use City of Coppell Standard Type "4" Embedment. 7. Sheet 27 of 28: a) Existing Pavemen~ Connection: Replace No. 3 Bars on 24-inch centers with No. 6 Bars on 24-inch Centers. b) Left Turn Lane Detail: Median Nose is to be pavestone as per street scape plan. From a telephone conversation today with the developer's engineer, we have learned that they have not been able to secure the required offsite easement for construction of "Y" inlet shown at the end of Storm Sewer Line "D-i". They are proposing a revision in the storm sewer plan in this area; however, we have not yet received their revised plans. We have asked that those plans be submitted to our office for review along with their submittal to the City of Coppell. We are enclosing the City's first marked up set in addition to our second marked up set which identifies the above listed con%ments on the construction plans. Please forward these marked up sets and co~ents to the Public Work DRC Members for their review and cogent. We have calculated the preliminary development fees for this project and have provided a draft letter for your use. You should find that letter in your Assessment Fees, Draft Letter file. The letter should indicate to the developer's engineer that all appropriate fees shall be paid prior to final approval of the construction plans and that paid receipts should be submitted both to the Coppell Engineering Department and to Shimek, Jacobs & Finklea. We are available to discuss this project further at your convenience. Sincerely, ~ Gary C. Hendricks, P.E. cC. ~ppell Public Works, DRC Members } rI AO~ '" Mr' Or MOV~MJ~T ' ! I J--~L! ~PICAk CROSS ~N, ~wN6 s~&cc EXTEND ~ & ~NT, ~,, ~, ~ (-'~-'F ~,,s t DETAIL OF NOSE FOR MEDIAN ISLAND ) svERSE JOINTS.