Loading...
Wynnpage-CS 910624DATE: TO= FROM: RE= COPPBnn PUBLIC WORKS June 24, 1991 MEHORAND~ Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Utilities Superintenden~ Development Fees for~3~n~Page The following fees should be assessed on the above referenced project. Water Impact Fee: 78 - 5/8" x 3/4" Domestic Meter/s = 78 ESU's Irrigation Meter/s = ESU's Fireline Meter/s = N/A ESU's Total 78 ESU's @ $660.00 ea = $51,400.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: 78- 5/8" x 3/4" Domestic Meter/s = 7__8 ESU's ~ $422.00 = $32,916.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection F~e 78 Connections ~ $100.00 each = $7,800.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 78 Connections @ $100.00 each = $7,800.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 78 Residential Lots at $150.00 each N/A Units (Multi family) at $75.00 each = $11,700.00 =$ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Wvnn Pa~e The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 18 $1,143.72 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 5 $ 484.25 OTHER Street Name Pole S 57.72 2 S 115.44 Keep Riqht $ 63.54 2 $ 127.08 Relocate-Bases Only $ 11.16 2 $ 22.32 (Keep Right) or TOTAL $1,892.80 2 Keep Right $ 63.54 2 or ($1,997.57) (if signs currently do not exist) * Cost breakdowns may be obtained from Public Works by written request. WPAGE.HLP