Wynnpage-CS 910624DATE:
TO=
FROM:
RE=
COPPBnn PUBLIC WORKS
June 24, 1991 MEHORAND~
Shohre Daneshmand, Acting City Engineer
Howard Pafford, Water Utilities Superintenden~
Development Fees for~3~n~Page
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
78 - 5/8" x 3/4"
Domestic Meter/s = 78 ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = N/A ESU's
Total 78 ESU's @ $660.00 ea = $51,400.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
78- 5/8" x 3/4" Domestic Meter/s = 7__8 ESU's ~ $422.00 = $32,916.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection F~e
78 Connections ~ $100.00 each = $7,800.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
78 Connections @ $100.00 each = $7,800.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
78 Residential Lots at $150.00 each
N/A Units (Multi family) at $75.00 each
= $11,700.00
=$
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Wvnn Pa~e
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 18 $1,143.72
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 5 $ 484.25
OTHER
Street Name Pole S 57.72 2 S 115.44
Keep Riqht $ 63.54 2 $ 127.08
Relocate-Bases Only $ 11.16 2 $ 22.32
(Keep Right)
or TOTAL $1,892.80
2 Keep Right $ 63.54 2 or ($1,997.57)
(if signs currently do not exist)
* Cost breakdowns may be obtained from Public Works by written
request.
WPAGE.HLP