Loading...
Vistas of C-CS000425Project: Date: DEVELOPMENT FEE TABLE Vistas of Coppell Phase 2B-Addendum for Irr. Meter 04/25/2000 TOTAL FEES DUE Water Impact Fee $450.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (I00% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $25.67 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee [nfo N/A (100% due prior to Acceptance of Project Street Sign Fee [nfo N/A (100% due prior to Acceptance of Project Construction Inspection Fee [nfo N/A TOTAL $555.67 DEVELOPMENT FEE WORKSHEET -'~ROJECT: Vistas of Coppell Phase 2B-Addendum for Irr. Meter DATE: 04/25/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 0 = 0 1 - 5/8 inch X 3/4 inch = 1 0 = 0 Fireline Meter(s): 0 = 0 Total #: 1 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) ~--rigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $25.67 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $450.00 $50.00 $0.00 $25.67 $o.oo $o.oo $0.00 $30.00 $o.oo $o.oo $0.00 Page 1 P.O. Box 478 CwX, p~. TX ~9 Fa~: (~2)304-a~9 lax: ~'t2)~4-3570 ENGINEERING DEPARTMENT FAX COVER SHEET Ondudlng cov~ sheet) ri Urgent ri For Review [] Please Comment [] Plm Reply Ig~Requmlted *Comments: /I / 2 / ~ ti I ,~ ~1 , 1/ t IF YOU DO NOT RECEIVE .Ar .f. OF THE PAGES, Pr.RASE CAI'.I. (972) 304-3679