Loading...
Vistas of C-CS000605 Project: Date: DEVELOPMENT FEE TABLE Vistaz of Coppell Phase 2C-Addendum for lrr. Meter 04/25/2000 TOTAL FEES DUE Water Impact Fee $4-50.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) -- Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $25.67 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100 % due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 000% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building permit) ! Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Penni0 Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100 % due prior to Council Approval) Street Light Fee Info N/A (100% due prior to Acceptance of Project Street Sign Fee [nfo N/A (100% due prior to Acceptance of Project Construction Inspection Fee [nfo N/A TOTAL $555.67 DEVELOPMENT FEE WORKSHEET PROJECT: Wtstas of Coppell Phase 2C-Addendum for Irt. Meter DATE: 04/25/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's I - 5/8 inch X 3/4 inch = 1 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 1 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: ~- Total #: 1 Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (,NI other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) trrigation~Fireline Water Meter Fee: Total #: 1 irrigation Meter(s) @ $25.67 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ S0.1X) (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections ~ $50.00 ea. (100% due prior to issuance of building permit) Silty Final Inspection Fee (All developments): Total #: 0 Lots ~ $,50.00 ea. (100% due prior to issuance of building permit) $450.00 $50.00 $0.00 S25.57 $0.00 $0.00 * $~0.00 $0.00 Page I