Vistas of C-CS 971105 (2)The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
November 5, 1997
Kenny Hafner
Centex Real Estate Corporation
1660 South Stemmons, Suite 150
Lewisville, TX 75067
Vistas of Coppell, Phase 2C
Development Fee Assessment
Dear Mr Earle:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $114,075.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~.
K~ethg~M./~n~, 'p. E.
Director of Engineering & Public Works
CC;
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENTFEETABLE
Project: Vistas of Coppell, Phase 2C
Date: 11/5/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $29,250.00 $29,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,250.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,569.10
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,950.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $29,250.00 $29,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $3,250.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $3,250.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0 Will Build
(100% due prior to Council Approval) Hike/Bike Trail
Roadway Impact Fee $55,575.00 $55,575.00
(100 % due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $127,344.10
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $114,075.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Vistas of Coppell, Phase 2C
DATE: 11/5/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
6§ - 5/8 inch X 3/4 inch
65
Fireline Meter(s):
Total #: 65 ESU's @ 8450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 65 Connections @ 850.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 65 Domestic Meter(s) @ 824.14
(Single f~mily due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 65 Meter(s) @ 830.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Mater(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
65
@ 8450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 65 Connections @ 850.00 ea.
(100% due prior to issuance of building permit}
Utility Final Inspection Fee (All developments):
Total #: 65 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
'ESU's
ESU's
ESU's
$29,250.00
83,250.00
81,569.10
80.00
80.00
80.00
81,950.00
$0.00
829,250.00
83,250.00
83,250.00
Page 2
DEVELOPMENT FEE WORKSHEE £
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50°6 paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
65
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$83,525.00
N/A
$55,575.00
Informat~n not
availableat this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contyacts
Page 3
ROADWAY IMPACT FEE CALCULA': dONS
PROJECT:
DATE:
Vistas of Coppell, Phase 2C
11/5/97
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Residential
Land Use **
Buildin~ Size (So,. Ft.)
Developmem Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Single-Family Detached
N/A
65
2.85
$300
Roadway Impact Fee due = (Developmem Units) x
Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = $55,575.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)