Loading...
Vistas of C-CS 970918The City With A Beautiful Fulure Centex Homes 1(~0 S,~ Stemmons, Suite 230 Lewi~fllle, TX 75067 P.O. Box 478 C~ppell, Texas 75019 214-~62~O22 September 18, 1997 Vistas of Coppell, Phase 2A Devdopment Fee Assessment (Additional 1" Irrigation Meter) Dear Mr ~arle: Enclosed is a copy of thc City of Coppell Development Fee Assessment table, along with a copy of the l)evelopment Fee calculations for the referenced development. Plea~ make payment to the City of Coppell in thc amount of $1,267.75 and forward to the Finance Depas[mcnt along with a copy of the Fee Assessment table. This amount represents the cost for ~e additional 1" irrigation meter requested by Mr. Wally Younger with Centex Homes. If you have any questions, please contact me. Sincer¢:ly, Kenneth :M. Griff'm, P.E. DLrecto~' of Engineering & Public Works CC: Jennifer Armstrong, Finance Dffector Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Db-. Leisure Services E~¥GL~TEERZNG 2~ PARKWAY BI.VD, ~OPP£LL, TX F-AX NO. (972) ~04-3570 DEPARTMENT FAX CO VER SHEET FIRM: ~ NO: ~h~Z ~ TR~.~SMITTED BY: C~---' NU){f~ER OF PAGES (INCLUDING COVER SHEET) If YOU DO NOT RECEIVE ALL OF T'H~'~'' PAG[S, PLEASE CALL (972) .304-5679. 09/19,'97 0~:~1 CITY OF CgPPELL ENSIHFERING ~ 972Z15~722 N0.830 D04 DEVELOPMENT FEE WORKSHEET PROJECT: Vistas of Coppell, PItase 2A DATI": 9/18/97 Warner Impact Fee: Domestic Meter(s); irrigation Meter(a); 1 - 1 inch 2,5 Firelina Meter(a): Total #: 2.5 ESU's @ 6450,00 ea, (100% due prior to Council approval of the final plat) Watch,- Tap Inspection Fee: Total #: 1 Connections @ 650.00 es, {Single family due prior to issuance of building permit) {All other developments due prior to issuance of meter) Meter Fee (Domestic): Total #; 0 Domestic Meter(s] ~ {Single family due prior to issuance of building permit) (All other developments due prior to issusrma of meterl Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Mater{s) ~ Total #: 0 Flrellne Meter(s) ~ (100 % due prior to issuance of water meters) $57.75 Water Meter Deposit Fee (Domestic): Total #: 0 Mater(s) @ 630.00 ea. {100% due prior to issuance of water meters) IrrigationllAre Meter Deposit Fee: Total #: 1 Meter{s) @ 635 O0 ea. (100% due prior to issuance of water m~ters) Wa~lewater Impact Fee: Total Domestic Meters EaU' 0 ~$450.00 ea. Wa~!~water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Fkual Inspection Fee (All developments): Total ~: 0 Lots ~ $50.00 ea. (100% due prior to issuance of builcting permit) ESU's ESU'S ESU's ESU's 61,125,00 $50.00 $0.00 $57,75 60.00 $0,00 $0.00 635.00 ~0,0o $0.00 ~0,00 Page 1 DEVELOPMENT FEE TABLE Project: Vistas of Copl~ll, Phase 2A Date: 9/18/97 RE: Additional Irrisation Meter TOTAL FEES DUE Water Impact Fee .f $1,12.5.00 (100 · ,d, pc prior to Council Approval) Water Tap laspection Fee $50.00 (100% due at?suaace of Water Me~er) Water Meter Fee (Domestic) $0,00 (100% due at Issuance of Water Me~..r.) Water Meter Fe, (ltrigation/Fireliae) $57.75 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuane~ of Water Meter) IrrigationZFireline Meter Deposit $35.00 (1005~ due at lssuanee..o.! Water, ,.~ Meter) Wastewater Impact Fee $0.00 (100% clue prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Buil6ing Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0,00 (100% clue t~ior to Council Approval) "~adway Impact Fee $0.00 (100 % due prior to Council Approval) Street Light Fee (100% due prior to Aceeptaace of Project Street Sign Fee N/^ (100% due prior to Acceptance of Project Construction Insp~;tion Fee N/A TOTAL $1,267.75 0~/1~/~? 0~:20 CITY OF COPPELL ENGINEERI~ DEVELOPMENT FEE WORKSHEET Pa~', Fee ~For Rcsdenfial Developmatts Only): * Preliminary plat approved pr[or to June 2~, 1992: N/A N/A Single-lamily ~) $150.00 I Lot Multi-faroily ~ $75.00 / Unit (50% ~aid 13rJor to Council approval of finsJ plat) (150% paid at issuance of building permitl * Pt'eliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family ~b $350.00 / Unit (SO% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ ~1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: ¢~ee attached fee ~alaulations) Strand Lighting Fees: A~eased for lighting in the City's right-of-way. This fee cannot be accessed until after T.LI. Electric submits the lighting plan for the proposed development. Once ~he plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) NIA N/A N/A N/A N/A N/A $0.00 Street Sign Fees: Assessed for signage In the City's righ~-0f-wey~ (Ssa attm]hed fee salculatians if applicable) N/A Core,ruction Inspection Fee~: A copy of the developmen'c contract must be submitted for assessroent. The contracts should indicate the cost to construct the iml3rovements that ara inspected by the Engineering Department. (2% o~ davelopmenz cost required for private improvements) (4% of development cost required for public improvements) Page 2