Loading...
Vistas of C-CS 970829DATE: TO: FROM: RE: COPPELL UTILITIES DIVISION August Zg, 1997 Garreth Campbell, Construction Inspector Curtis Jordan, Utilities Division Follow-up Walk-Thru Vistas of Coppell 2B Listed below are Street Division comments relative to walk thru. 1. Still no valve extension on Cresthaven. 2. Straighten stack on lot 28 Block E. 3. Straighten stack and remove dirt Lot 4. Block D. 4. Crestwood Dr. tracing wire in the way. 5. Note: Garreth: Let Curtis know when all storm drains are finished. MESSAGE CONF I RMAT I ON 08×29~97 11:49 ID--CITY OF COPPELL DATE 08×29 SIR-TIME DISTANT STATION ID MODE PAGES 00~21" CITY OF COPPELL CALLING 01 RESULT OK 0000