Vistas of C-CS 970829DATE:
TO:
FROM:
RE:
COPPELL UTILITIES DIVISION
August Zg, 1997
Garreth Campbell, Construction Inspector
Curtis Jordan, Utilities Division
Follow-up Walk-Thru Vistas of Coppell 2B
Listed below are Street Division comments relative to walk thru.
1. Still no valve extension on Cresthaven.
2. Straighten stack on lot 28 Block E.
3. Straighten stack and remove dirt Lot 4. Block D.
4. Crestwood Dr. tracing wire in the way.
5. Note: Garreth: Let Curtis know when all storm drains are
finished.
MESSAGE
CONF I RMAT I ON
08×29~97 11:49
ID--CITY OF COPPELL
DATE
08×29
SIR-TIME DISTANT STATION ID MODE PAGES
00~21" CITY OF COPPELL CALLING 01
RESULT
OK 0000