Loading...
TR9101-CS 901102November 2, 1990 To: Alan D. Ratliff, City Manager From: Frank Trando, Deputy City Manager/Finance Directo~ We have researched the files on Denton Tap and found that Arjang Electric Systems installed traffic signals at Parkway Boulevard and Denton Tap and Bethel School and Denton Tap at a cost of $157,911.50. We paid Ginn, Inc. a total of $25,894.06 associated with the various aspects of designing, inspecting, acquiring right-of-way easement, etc., for those stgnalizations. Based on this information I would budget $13,000 to $15,000 for design and inspection and $79,000 to $85,000 for installation of the signal. If you need more information, please do not hesitate to contact me. FT/lr · xC.;~[~, Steve~ram, Dtrector of Public Works SIGNALIZ.001