Loading...
Villas at LV-CS050518COl'FELL Daniel L. Heischman, P.E. Dowdy, Anderson & Associates 5225 Village Creek Drive, Suite 200 Plano, TX 75093 RE: Villas at Lake Vista, Phase One REVISED Fee Assessment Letter May 18, 2005 Dear Mr. Heischman: Enclosed is a revised copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Per your request, water impact fees were calculated based on 93- 3/4" meters for domestic water. However, since 1" meters are required for fire protection, the actual costs of the 93-1" meters are assessed. Please make payment for the Impact Fees to the City of Coppell in the amount of $199,020.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Charlene La IVD, fttina, E.I.T. Graduate Engineer CC: Jennifer Armstrong, Finance Director ~ry Beth Spletzer, Admin Secretary, Building Inspections ~lr,~ enn Hollowell, P.E., Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 255 PARKWAY llr p O BOX 94?6 ~ COPPELL TX 75Oig lr TEL 972/462 0022 ~tr FAX 972/304 3673 DEVELOPMENT FEE TABLI Project: Villas at Lake Vista, Phase One Date: 5/17/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $37,240.00 (100% due at Issuance of'Building Permit) Water Tap Inspection Fee $4,900.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $5,840.08 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $846.88 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $2,820.00 (100% due at Issuance of'Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $28,280.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $4,700.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $4,700.00 (100% due at Issuance of Building Permit) Park Fee $I 19,505.00 $119,505.00 (100% due prior to Council Approval) Roadway Impact Fee $79,515.00 $79,515.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II IOTAL $288,466.96 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $199,020.00 D~VELOPMENTFEE WORKSHEET PROJECT: Villas at Lake Vista, Phase One DATE: 5/17/2005 Water Impact Fee: Domestic Meter(s): 93 - 5/8 inch X 3/4 inch = 93 1 - 2 inch = 8 Irrigation Meter(s): 4 - 2 inch = 32 0 = 0 Fireline Meter(s): 0 = 0 Total #: 133 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 98 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 93 $60.52 1 Additional Domestic Meter(s) @ $211.72 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 4 Irrigation Meter(s) @ $211.72 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 94 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESL's: 101 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 94 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 94 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's ESU's $37,240.00 $4,900.00 $5,628.36 $211.72 $846.88 $0.00 $o.o0 $2,620.00 $120.00 $28,280.00 $4,700.00 $4,700.00 Page 1 D=VELOPMENT FEE WORKSHE=T Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 93 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Zone 2 $119,505.00 $0.00 $79,51 500 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROAD ¢~AY IMPACT FEE CALCULA · IONS PROJECT: DATE: Villas at Lake Vista, Phase One 5/17/2005 ROADWAY IMPACT FEE: ;ervice Area * 2 Category ** Residential Land Use ** Residential Others Not Specified No. Lots/Units 93 Development Units ** 93.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $79,515.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)