Loading...
Waters Edge P2-CS 940805D~TE= TO= FROM= COPPELL PUBLIC WORKS MEMORANDUM August 5, 1994 Larry Davis, Construction Inspector ~ Howard L. Pafford, Utilities Superintendent ~Follow-Up Walk-Through on Waters Edge II Utilities personnel performed a follow-up walk-through on the above referenced project and the following items remain deficient: 1) 2) 3) 4) Lot 10 Block D - Meter service leaking. Lot 10 Block D - Lot clean out has trash in bottom. Manhole at Sec 11+90 of line A needs ring reset and chimney seal installed. Lot 6 Block D - Meter service is leaking. 5) 7) Lot 4 Block D - Lot clean out run over. Standard city clean out needs grouted inside and lid replaced and painted red. Install approved brand rain pans (Rain Stopper or Knutson). s) Lot 20 Block A - Install blue fire hydrant marker in road in front of fire hydrant. 9) ~ Sandy Lake needs lowered to new grade. Please ensure these items get completed prior to any final acceptance or any release getting approved. Paint main line valve caps blue and fire hydrant caps red. Existing manhole at southeast corner of project on HLP/dm cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building official WALKTHRU.HLP\WATRSEDG.II -7) ~'",as+o. t t