Vista Point II 3-7-CS050603DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
:3RIGINATION DATE:
Vista Point II, Lots 3-7 (Retail)
Pacheco Koch
6/3/2005
SENT
ASSESSMENT ASSESSED FEE
Water Impact Fee $700.00
Wastewater Impact Fee $0.00
Park Fee $0.00
Roadway Impact-Zone $0.00
Street Sign
Street Light
Construction Inspection $6,540.00
EG or Bore Permit
Overtime Inspection
Water Tap Inspection $100.00
Wastewater Tap Inspection $0.00
Water Meter (Domestic) $0.00
Water Meter (Fire/Irrig) $8,342.30
Meter Deposit (Domestic) $0.00
Meter Deposit (Fire/Irrig) $60.00
Utility Final Inspection $0.00
.Subtotal to Eng. $6,540.00
AMOUNT PAlE DATE
$6,540.00 pc 6/28/2005
$100.00 di 7/19/2005
$8,342.30 di 7/19/2005
$60.00 di 7/19/2005
$6,540.00 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $15,742.30 $15,042.30 $700.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.