Loading...
Vista Point II-CS041206 T PI E · C I T Y . 0 F Coi i Ei L December 6, 2004 B. David Littleton, P.E. Halff Associates 8616 Northwest Plaza Drive Dallas TX 75225 Vista Point II, Lot 1 Block A Revised Fee Assessment Dear Mr. Littleton: It has come to my attention that the revised fee estimate letter dated November 5, 2004 improperly reduced the water meter deposit and tap inspection fee for the two fire line meters that were the subject of that revision. This revision corrects that oversight, and results in an additional $160 fee. I have attached the revised fee tables for your review. This brings the total amount due for utility meters and inspection fees, exclusive of impact fees and construction inspection fees, to $10,260.90. A representative of Cal-Har construction paid via check number 036779 the amount of $9,950.90 today. That leaves a balance due of $310.00. Please provide a check in that amount when you pick up your water meters. If you have any questions or need any additional information, please feel free to contact me at your convenience. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office: 972-304-7044 Fax: 972-304-3570 CC: 12~bie Ingrain, Public Works Jennifer Armstrong, Finance Director Beverly Huntsman, Building Inspections DEVELOPMENT FEE WORKSHEET PROJECT: V~ta Point H- Lot 1, Block A - R~i~ed DATE: I1/5/~004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 3 - 2 inch = 24 ESU's 2 - 2 inch = 16 ESU's 0 = 0 ESU's 1 - 8 inch & 1 - 10 inch = 2.5 ESU's Total#: 42.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 7 Connections @ $50,00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: 3 Domestic Meter(s) @ $211.72 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $211.72 Total #: 0 Additional irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @- $4,971.09 Total #: 1 Fireline Meter(s) @ $3,371.21 (100% due prior to issuance Of water meters) Domestic Water Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance Of water meters) Irrigation/Fire Meter Deposit Fee: : Total 0: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 24 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance 6f building permit) Utility Final Inspection Fee (Ali developments): Total 0: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $11,900.00 $350.00 $635.16 $423.44 $0.00 $4,971.09 $3,371.21 $90.00 $120.00 $6,720.00 $150.00 $150.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $113,663.25 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment, The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 DEVELOPMENT FEE TABLE Project: Vista Point H- Lot 1, Block A ~ Revised Date: 11/5/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,900.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $350.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $635.16 (100% due at Issuance of Water Meter) Water Meter Fee (Irfigation/Fireline) $8,765.74 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,720.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee' $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $113,663.25 $113,663.25 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) il Street Sign Fee Information not Available (100% due prior to Acceptance of Project) [I Construction Inspection Fee Information not Available (100% due prior to Start of Construction) l[ TOTAL $142,544.15 TOTAL AMOUNT DUE PRIOR TO FILING OF FINAL PLAT $113,663.25 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Vista Point H - Lot 1, Block.4 DATE: 11/5/2004 ROADWAY IMPACT FEE: Service Area * 2 Category ** Office Land Use ** Business Park Building Area (sf) 93,550 Development Units ** 93.55 Vehicle Miles per Development Unit ** 4.05 Fee ]~er Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $113,663.25 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)