Vista Point II-CS040922DEVELOPMENT FEES
PROJECT NAME: Vista Point II, Lot 1 Block A
ENGINEER: Halff Associates
DRIGINATION DATE: 9/22/2004
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
9/22/2004 Water Impact Fee $11,900.00
Wastewater Impact Fee $6,720.00
11/5/2004
12/13/2004
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
Early Grading
Overtime Inspection
n/a
$113,663.25
$113,663.25 pc
$17,263.00
$1,825.20
$160.00
9/24/2004
$17,263.00 rb 11/5/2004
$1,825.20 pc 9/24/2004
9/22/2004 Water Tap Inspection $350.00
Wastewater Tap Inspection $150.00
Water Meter (Domestic) $635.16
Water Meter (Fire/Irri9) $8,765.74
Meter Deposit (Domestic) $90.00
Meter Deposit (Fire/Irrig) $120.00
Utility Final Inspection
$150.00
BIISubtotal to Eng,
TOTALS
$250.00 di 12/3/2004
$100.00 mc 12/14/2004
$150.00 di 12/3/2004
$635.16 di 12/3/2004
$8,765.74 di 12/3/2004
$90.00 di 12/3/2004
$60.00 di 12/3/2004
$60.00 mc 12/14/2004
$150.00 mc 12/14/2004
$132,911.45 $132,751.45
$160.00
TotalFees Fees Paid Amount Owed
$161,792.35 $143,012.35 $18,780.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.