Loading...
Vista Point II-CS040922DEVELOPMENT FEES PROJECT NAME: Vista Point II, Lot 1 Block A ENGINEER: Halff Associates DRIGINATION DATE: 9/22/2004 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 9/22/2004 Water Impact Fee $11,900.00 Wastewater Impact Fee $6,720.00 11/5/2004 12/13/2004 Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection Early Grading Overtime Inspection n/a $113,663.25 $113,663.25 pc $17,263.00 $1,825.20 $160.00 9/24/2004 $17,263.00 rb 11/5/2004 $1,825.20 pc 9/24/2004 9/22/2004 Water Tap Inspection $350.00 Wastewater Tap Inspection $150.00 Water Meter (Domestic) $635.16 Water Meter (Fire/Irri9) $8,765.74 Meter Deposit (Domestic) $90.00 Meter Deposit (Fire/Irrig) $120.00 Utility Final Inspection $150.00 BIISubtotal to Eng, TOTALS $250.00 di 12/3/2004 $100.00 mc 12/14/2004 $150.00 di 12/3/2004 $635.16 di 12/3/2004 $8,765.74 di 12/3/2004 $90.00 di 12/3/2004 $60.00 di 12/3/2004 $60.00 mc 12/14/2004 $150.00 mc 12/14/2004 $132,911.45 $132,751.45 $160.00 TotalFees Fees Paid Amount Owed $161,792.35 $143,012.35 $18,780.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.