White Glove-CS 951218COPPELL UTILITIES
DATE:
TO:
FROM:
RE:
MEMORANDUM
october 27, '~995
Gatt.th camb.11, Cons~r.uc~ion Insp.eotor
Howard L. Pafford, Ut=iLtLes SuperLntenden~
Water and Sewer Walk-Through for White Glove
Utilities staff has completed a walk-thru for the above
referenced project this morning and the following items were
found to be deficient.
*Needs new valve lid in roadway
*Uncover all fittings in meter boxes,covered with water
*Uncover both double checks and expose all fittings
*Fire hydrant valve needs a concrete pad
*New manhole needs rainpan
Please ensure that each of these items are corrected prior to
acceptance of this project.
HLP/hp