Waters Edge P2-CS 930113COPPELL PUBLIC WORKS
DATE:
TO:
FROM:
RE:
January 13, 1993
Ken Griffin, P.E., City Engineer
Public Works Staff~~1
Development Fees for Waters Edge Phase II
Attached is a revised compilation of the fees due for Waters Edge Phase II. Due to
misinformation regarding the date of the preliminary plat approval the fees listed for park
fees were incorrect.
The correct fees will be 20 residential lots at $350.00 each for a total of $7,000.00.
We hope this did not cause a problem.
RSW/dm
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: 1/4/94
TO: Ken Griffin, P.E., City Engineer
FROM: Public Works Staff
RE: Development Fees for Waters Edge Phase II
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
20 - 5/8" x 3/4" Domestic Meter/s = 20 ESU's
This ass4essment does not include irrigation meter fees and impact
information was not available.
Total 20 ESU's @ $650.00 ea = $13,000.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
20 - .5/8,, x 3/4,, Residential Meters = 20 ESU's
Total 20 ESU's @ $450.00 ea = $4,500.00
100% due prior to Council approval
Water Tap Inspection Fee
20 Connections @ $100.00 each =
of the final plat.
$2,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
_. 20 Connections @ $100.00 each = $2,000.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
20 lots ~ $50.00/lot = $1,000.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
20 - 5/8. x 3/4. Residential Meters ~ ~ = $ 445.00
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
-,5/8" x 3/4" Irrigation Meters ~ 2_~.25 ea__ = ,$
Total $
Information not available.
100% due prior to issuance of water meters.
Water Meter Deposit
Residential - 20 meters ~ $30.00 ea = $ 600.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 3
Park Fee
Residential Lots at $150.00 each = ~
Units (Multi family) at $150.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
20 Residential Lots at $350.00 each = $ 7,000.00
Units (Multi-Family) at $350.00 each = ~
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Waters Edge Phase II Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
$IGN UNIT PRICE ~
No Parking $53.10
Speed Limit $63.54 2
Yield $58.56
Stop $65.12
Street Name $11.60 2
Stop & Street Combo $96.85
OTHER
EXTENDED PRICE
$127.08
23.20
TOTAL 4 $ 150.28
Cost breakdowns may be obtained from Public Works by written
request.
FEES.HLP.WTRSEDII
Revised 12/15/92